My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994 JUL-DEC-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:15:21 PM
Creation date
11/17/2016 3:30:54 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Canteen has said the layout in the current design could accommodate 3 , 000 <br /> students . <br /> The $100 , 000 test shown was before Tavares ' report. <br /> There will be a minima amount of additional cost for a central kitchen . <br /> Would Dr . DeMoura advise the Committee to design for a central kitchen? <br /> Dr . DeMoura said yes , it would be valuable . He does not have anything in <br /> writing from Canteen about projected labor cost savings . The Board of <br /> Education does not have a problem with it, they ask that some items be <br /> cooked on site . <br /> 3 . Proposals from the Teachers ' Committee meeting . The Committee asked <br /> SMMA for cost impact of these items . <br /> 3 . 4 storage for large equipment - lawn mowers , etc . <br /> They also suggest storage near the fields , for large athletic equipment. It <br /> should be closer to the football field . <br /> Ed does not want to commit to having storage under the bleachers. <br /> Peter asked for an estimate on the cost for the storage area . <br /> Do they want water and electricity in the "ticket booth" far food service? <br /> Ed said it would be an expensive item $40-50 , 000 . <br /> Dar, said if they plan to sell tickets , there will be a need to enclose the <br /> field to control access . A. chain link fence around the football field would <br /> be very expensive , easily $50 , 000. <br /> Bill suggested monitoring it at the parking lot - charge to park . <br /> The Committee agreed they don ' t want a fence. <br /> 4 . Egress doors to classrooms - Dr . DeMoura had requested it between pairs <br /> of classrooms . <br /> Proposals submitted by Michael Ford : <br /> 5 . 1 lights on poles <br /> 5 . 2 repeat of 6 . 2 <br /> 5 . 3 technology issue - the Committee wants to do it . <br /> 5 . 4 The School Committee wants meta detectors installed at all the <br /> entrances . Surveillance cameras in the future . <br /> 5 . 8 Will try to resolve . <br /> 5 . 9 Will be designed . <br /> 5 . 10 Will be painted/striped in the parking lots . <br /> 5 . 12 Already provided . <br /> 5 . 13 Will use whatever rooms are available . <br /> DESIGN DISCUSSION WITH ARCHITECTS <br /> Ed wants to talk about roofs , berms and revised site plan . <br /> He wants to clarify the cost of sloped roofs and clarify technical issue of <br /> sloped roofs . <br /> He contacted Simpson: Gumpson and Hager , roofing engineers and they <br /> recommended : <br /> a. contract with them to review the details of the roof design . They can <br /> make a recommendation to the Committee on flat vs . sloped roofs . <br /> B. Committee can build into the spec full time observation of the <br /> installation of the roof . You usually know within the first few days of <br /> construction how the job is going . A, cost of $50 . 00 per hour , $2 , 000 per <br /> week or about $4 , 600 'Go ubserve tyle entire roof 'work . <br /> Paul said the installer tend to do a much better job just knowing someone <br /> is there to observe them. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.