Laserfiche WebLink
M1 <br /> of the ability to adjust to change in flows from 400-1 , 100 students. The <br /> bacteria will respond to the food you give it. <br /> Bill said if we only need 14,000 he can 't see paying for a larger plant, <br /> $100,00 is $100,00. <br /> Mark said if the Committee is talking about phasing it, the equipment cost <br /> is only $10,00, the tanks are the big cost and they can be added in later. <br /> Peter would like to table this discussion to next week when Steve Greelish <br /> and Paul Griffin are present. <br /> (Janice Mills left the meeting. Peter Dinizio also left the meeting and <br /> Joe Polio ran the meeting. ) <br /> BUILDING MATERIALS <br /> Ray presented some material choices - brick, wood and metal panels (factory <br /> finished aluminum) . <br /> Colors for windows: they suggested green is a Cape color, or white- a warm <br /> white. <br /> The Committee agreed white will never be outdated. <br /> The metal will be around doors and window and the mechanical units in the <br /> windows. <br /> Exposed roof - shingle or membrane, they suggest grey. <br /> Brick - will be jumbo bricks. They will bring in the different size <br /> options. <br /> Joe said personally he likes the small brick, it fits the scale of the <br /> Cape. <br /> Merry Sue noted jumbo bricks are used at Sandwich High, she never even <br /> noticed they were larger sized. <br /> Stripes on the building - a different color brick, gives horizontal <br /> reference. Will be indented. <br /> Joe does not like the color change, the color will fade. He likes the <br /> signature line but is should be done with brick coursing. <br /> Ray will bring back some other size and color samples for brick. The one he <br /> had the Committee agreed was too dark. It may be good for the stripe. <br /> Bob suggested talking about color early in the agenda next week so the <br /> samples can be brought outside and viewed under sunlight. <br /> Wood siding : will be used for the high areas of the gym and theater. <br /> They will check which is the better grade of cedar red or white. <br /> They will bring stain color samples - light grey and natural . <br /> Joe suggested boxing in the columns (at the canopy) to prevent marking and <br /> 4i denting of the columns. <br /> �a <br /> PROJECT MANAGER REPORT <br /> Ian presented an updated value management proposal report. There has been <br /> only a $100,00 decrease. There is still a $1 . 2 million overrun. <br /> Schedule: Bob Fournier sent a letter to Ian (copies enclosed) re : project <br /> schedule options. Each of the options has the risk of requiring design <br /> 8 <br />