Laserfiche WebLink
is <br /> Mashpee High School Project: Status of Value Management Proposals ChartWON / ANDREW CHARTWELL&CO <br /> Item Proposal and Dlgeat of Committee's Decisions and SMMKs Subsenuent Review Saving Addition <br /> PROPOSALS RECEIVED SUBSEQUENT TO PRESENTATION OF VALUE MANAGEMENT REPORT: <br /> 1. Central kitchen concept for 3000 students. <br /> 'Canteen' to confirm that existing design can accommodate 3000 persons. "minimal" <br /> 2. Sewage Treatment Plant: <br /> Proposal A: As Schematic Design. Held in reserve: parallel design. <br /> Proposal B: Down-slzed Plant. Proposal accepted. ? <br /> Proposal C: Alternative Proprietary System. Proposal not accepted. <br /> 3. The following proposals arose out of the Teachers' Committee meeting of <br /> August 16, 1994. All were accepted for development by SMMA. <br /> 3.1 Provide an out-of-doors athletic equipment storage room under the bleachers <br /> at the Football/Track stadium. <br /> 3.2 Provide a door direct to the exterior from the Art Room to a paved surface. <br /> 3.3 Provide a tackboard above the computer stations in each classroom. <br /> 3.4 Provide a "one truck bay size" storage area to the Sewage Treatment Plant for <br /> outdoor maintenance equipment. <br /> 4. Provide two egress doors to classrooms and other rooms likely to house more <br /> than 50 persons(B.Comm. meeting 23.Aug/94). Proposal accepted for pairs of <br /> classrooms. <br /> Sub-total <br /> Page 11 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br /> +�, `&c da•,,�, VM �9e xe' d. b1'&&&..,,dam IMP <br />