My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee High School Project: Status of Value Management Proposals C°hi3 ulw( 00 / ANDREW CHARTWELL&CO <br /> Item Proposal and Digest of Committee's Decisions and SMMNs Subsequent Review Saylnq Addition <br /> 11.14 Site services: corrugated polyethylene pipe in lieu of concrete. Proposal accepted. 19,300 - <br /> 11.15 <br /> 9,300 -11.15 Curbing: Pre-cast Concrete (instead of Granite). Proposal accepted with scope for <br /> granite at front drop-off areas. 117,600 <br /> 11.18 Reduction of Car Parking Stall Size. SMMA review: provide 9' x 18' in lieu of <br /> 10' x 20', pending varience approval. Proposal accepted. 50,400 <br /> 11.19 Reduce Number of Flag Poles. Provide two instead of four poles. Proposal <br /> accepted. 5,600 <br /> 11.24 Combine Fire and Domestic Water Entry. Proposal accepted. 134,400- <br /> 11.28 Campus Access: Walkway from intersection. Proposal not accepted but a path <br /> with lighting is to be provided beside the main entrance dual carriageway. 9,000 <br /> 11.29 Reduce Paving Thickness. Proposal accepted subject to geotechnical report. 92, 0 <br /> 11.31 Eliminate Parking Lot Islands. Proposal not accepted. <br /> 11.32 Depress Football Field. Proposal not accepted. <br /> 11.33 Drop-off's to be Closer to Building. Proposal accepted. 5,009. <br /> 11.34 Fill: Use On-site sand and Gravel. Proposal accepted pending receipt of <br /> geotechnical report. 80,W <br /> Nos. 11.16;11.17;11.20-11.23;11.25-11.27;11.30 not submitted. Sub-total 504,300 9,000 <br /> Page 9 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.