My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee High School Project: Status of Value Management Proposals ChOnWOH /ANDREW CHARTWELL&CO <br /> Item Proposal and Digest of Committee's Decislone and SMMA's Subsequent Review Saving Addition <br /> 11.2 Reduce number of tennis courts. SMMA to design for 6 courts but with provision for <br /> originally envisaged quantity (9) at a later stage. Proposal accepted. 112,000 <br /> 11.3 Eliminate Practise Football Pitch. Proposal not accepted. Possible alternative. <br /> 11.4 Football and Athletic Bleachers. Reduce seating capacity by 50 percent to 600. <br /> Proposal accepted. 30,000 <br /> 11.5 Eliminate football and athletics facilities. Proposal not accepted. <br /> 11.6 Eliminate fields: baseball, softball and soccer fields. Proposal not accepted. <br /> Possible alternative'. <br /> 11.7 Main Entrance Road: single entrance instead of dual drive. Proposal not accepted. <br /> 11.8 Irrigation: watering by hose instead of sub-surface piping. SMMA to recommend <br /> limits of irrigation. 112,000 — <br /> 11.9a Soft Landscaping: reduce area by one third. Pending final site plan. Decision regd. 56,000 <br /> 11.10 Site paving: reduce area by 1/5. Pending final site plan. Decision required. 251,300 <br /> i <br /> 11.11 Feature drive: reduce to single carriageway. Proposal not accepted. <br /> 11.12 Clearing and Grubbing: reduce area by 15 %. Pending final site plan. <br /> Decision required. 33,000 <br /> Sub-total 594,300 0 <br /> Page 8 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.