Laserfiche WebLink
r. <br /> Mashpee High School Project: Status of Value Management Proposals C havtw(O /ANDREW CHARTWELL&CO <br /> Item Proposal and Dluest of Committee's Declslons and SMMXs Subsequent Review Saving Addition <br /> 9a.6 Toilets: Automatic Electronic Faucets instead of self-closing. Proposal accepted. 5,900 <br /> 9a.7 Toilets: Electronic Flush Valves at Closets and Urinals instead of manual operated. <br /> Proposal accepted. 15,600 <br /> 9b.1 Fire Pump: delete. Proposal accepted. Flow test satisfactory. 45,700 <br /> 9b.2 "Blazemaster" CPVC Piping. Proposal accepted at Sept 2 meeting pending final <br /> resolution of ceilings. 2,400 <br /> 9c.1 HVAC: Split DX units instead of Central AC(for original areas) Proposal not accepted. 0 <br /> 9c.2 HVAC: AC entire school(except gym, toilets etc) instead of library, auditorium & <br /> offices only. Proposal not accepted. But SMMA has flexibility in the design so <br /> that full AC could be provided at a time in the future. <br /> 9c.3 Not submitted. <br /> 9c.4 Gym Heating• indirect fired gas furnace instead of hot water air-handling equip. <br /> Proposal accepted. 8,220 <br /> 11.1 Car Parking: reduce . At Committee meeting of August 16, decision taken to <br /> increase the number of spaces by 100 to give a total of 356 spaces. <br /> Reduce VE proposal by half; from $155,800 to $78,000. Proposal accepted. 78,000 <br /> Sub-total 134,320 21,500 <br /> Page 7 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />