My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee High School Project: Status of Value Management Proposals Ch011ft(OH I ANDREW CHARTWELL&CO <br /> Item Proposal and Digest of Committee's Decisions and SMMA's Subsequent Review Saving Addition <br /> 8b.3 Parabolic fixtures: reduce deep units to computer rooms. 8b.2 has already been <br /> accepted. SMMA recommends this proposal for possible future consideration. <br /> 8b.4 Eliminate multi-level switching in offices, Proposal not accepted. <br /> 8c.1 Lightning protection system:eliminate. Proposal not accepted. <br /> 8c.2 Satellite antenna: eliminate. Proposal not accepted. <br /> 8c.3 Integrated instead of separate communications systems. Proposal accepted. 27,800 <br /> 9a.1 Laboratories: eliminate compressed air. Modified proposal accepted. A portable <br /> unit is to be purchased under the budget for FF&E. 10,300 <br /> 9a.2 Gutters and down pipes instead of internal roof drains. No cost implications; no <br /> action required. Note comments of Building Inspector at August 30 meeting. <br /> 9a.3 Underslab piping: Schedule 40 PVC instead of C.I. Proposal accepted. 4,400 <br /> 9a.4 External plumbing: extra heavy C.I. to beyond paved area. Proposal not accepted. <br /> 9a.5 Duel Fuel Burners for Domestic Hot Water instead of Gas only. Proposal accepted. 44,000 <br /> Sub-total 42,500 44,000 <br /> Page 6 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.