Laserfiche WebLink
Mashpee High School Project: Status of Value Management Proposals CharRWOH /ANDREWCHARTWELL&CO <br /> Item Proposal and Digest of Committee's Decislons and SMMA's Subsequent Review Saving Addition <br /> 7.3 Lockers in the Schematic specification to be reduced from 1350 to 1180. <br /> Modified proposal accepted. 8,000 <br /> 7.4 Reception desk: reduce cost by 40 percent. Proposal accepted. 6,000 <br /> 7.5 Provide Community Use Lockers. Proposal not accepted. <br /> Ba.1 Provide Separate Primary Electrical Service to School and to STP instead of a <br /> secondary feed from school to STP. Proposal not accepted. <br /> 8a.2a Low Voltage Battery nstead of Emergency Generator. Proposal not accepted. <br /> 8a.2b Emergency generator to be external to the building. Proposal accepted. 6,200 <br /> 8a.3 Eliminate electrical closets on 2/F. Proposal not accepted. Closets required. <br /> 8a.4 Conductors: provide aluminium instead of copper. Proposal not accepted. <br /> Ba.5 Primary Metering instead of Secondary. Proposal not accepted. <br /> 8b.1 Theatre lighting: eliminate. Proposal accepted but to be an FF&E item. 151,000 <br /> 8b.2 Parabolic Fixtures: 3' instead of 4" deep units. Proposal accepted. 20,000 <br /> Sub-total 191,200 0 <br /> Page 5 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />