My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee High School Project: Status of Value Management Proposals CG¶aPlw(O /ANDREWCHARTWELL&CO <br /> Item Proposal and Digest of Committee's Declslons and SMMA's Subsequent Review Saving Addition <br /> 6.7 Eliminate Acoustic Ceiling Tiles in Classrooms or reduce by 40 percent. 2x4 units <br /> cheaper to install than 2x2. Replacement of sagging units is an aesthetic decision. <br /> Pending study of duct routes. Decision required. 78,000 <br /> 6.8 Main lobbies: provide quarry tile instead of Bluestone. SMMA review: proposal <br /> recommended. Pending materials' presentation. Decision required. 11,500 <br /> 6.9 Service area finishes: CMU walls not to be painted. Proposal not accepted. <br /> 6.10 Gym floor: synthetic floor instead of wood. Proposal not accepted. <br /> 6.11 Corridor ceilings: shaped instead of acoustic tile. Proposal not accepted. 0 <br /> 6.12 Classroom Finishes: GWB/metal stud instead of CMU. Proposal accepted. 112,000 <br /> 6.13 Toilet room finishes: CMU and epoxy paint instead of ceramic tiles. Proposal <br /> accepted. 30,000 <br /> 6.14 Ground Face Block instead of SGFT. SMMA to recommend masonry products. <br /> Pending presentation. Decision required. 48,000 <br /> 7.1 Toilet Accessories: Stainless steel in lieu of normal mirrors. Proposal not accepted. <br /> 7.2 Eliminate all changing lockers. Proposal not accepted. <br /> Sub-total 279,500 0 <br /> Page 4 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.