Laserfiche WebLink
Mashpee High School Project: Status of Value Management Proposals CG¶aPlw(O /ANDREWCHARTWELL&CO <br /> Item Proposal and Digest of Committee's Declslons and SMMA's Subsequent Review Saving Addition <br /> 6.7 Eliminate Acoustic Ceiling Tiles in Classrooms or reduce by 40 percent. 2x4 units <br /> cheaper to install than 2x2. Replacement of sagging units is an aesthetic decision. <br /> Pending study of duct routes. Decision required. 78,000 <br /> 6.8 Main lobbies: provide quarry tile instead of Bluestone. SMMA review: proposal <br /> recommended. Pending materials' presentation. Decision required. 11,500 <br /> 6.9 Service area finishes: CMU walls not to be painted. Proposal not accepted. <br /> 6.10 Gym floor: synthetic floor instead of wood. Proposal not accepted. <br /> 6.11 Corridor ceilings: shaped instead of acoustic tile. Proposal not accepted. 0 <br /> 6.12 Classroom Finishes: GWB/metal stud instead of CMU. Proposal accepted. 112,000 <br /> 6.13 Toilet room finishes: CMU and epoxy paint instead of ceramic tiles. Proposal <br /> accepted. 30,000 <br /> 6.14 Ground Face Block instead of SGFT. SMMA to recommend masonry products. <br /> Pending presentation. Decision required. 48,000 <br /> 7.1 Toilet Accessories: Stainless steel in lieu of normal mirrors. Proposal not accepted. <br /> 7.2 Eliminate all changing lockers. Proposal not accepted. <br /> Sub-total 279,500 0 <br /> Page 4 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />