My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee High School Project: Status of Value Management Proposals ChOrtWO /ANDREW CHARTWELL&CO <br /> Item Proposal and Dicest of Committee's Decisions and SMMA's Subsequent Review Saving Addition <br /> 4.2 Toilet partitions: baked enamel metal finish in lieu of 1" solid plastic. Proposal not <br /> accepted. Plastic to remain. <br /> 4.3 Gym Separation Wall. Proposal accepted to be an epoxy painted masonry wall. 80'000""- <br /> 4.4 <br /> 0,0004.4 Provide Breaks and Natural Light in Academic Corridors. Proposal not accepted. <br /> 4.5 Cafeteria:.glass doors instead of curtain wall to plaza area. Proposal not accepted. <br /> 5.1 Hydraulic elevator: provide lighter capacity. Proposal not accepted. <br /> 5.2 Auditorium: provide 'ramp instead of wheelchair lift. Proposal accepted. 12,000./ <br /> 6.1 Reduce Area of SGFT. SMMA relview: proposal recommended. Saving is a Y ) <br /> correction to the estimate. No deVision required. 120,000 <br /> 6.2 Reduce Area of Curtain Wall by 25 percent. Proposal accepted. 26,000 <br /> 6.3 Reduce 1/F Terazzo Tile to Admin. & Classroom Corridor. Proposal accepted. 120,000 <br /> 6.4b Quarry Tile on 1/F instead of Terrazzo. Proposal accepted. 13,000 <br /> 6.5a Quarry Tile on Stairs instead of Bluestone. Proposal accepted. 17,000 <br /> 6.6 Gym Wall: CMU and Acoustic Deck instead of acoustic SGFT . SMMA review: <br /> (a) provide acoustic metal deck. Proposal accepted. 25,000 <br /> (b) provide epoxy painted CMU in lieu of acoustic SGFT. Proposal accepted. 110,000 <br /> Sub-total 698,000 25,000 <br /> Page 3 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.