Laserfiche WebLink
n - <br /> Mashpee High School Project: Status of Value Management Proposals ChSVIWOH /ANDREW CHARTWELL&CO <br /> Item Proposal and Dinest of Committee's Decisions and SMMA's Subsequent Review Saving Addition <br /> 3.3 Entrance Mat Instead of Bluestone. Proposal accepted. 15,009/ <br /> 3.4* Roof: Provide 16 oz. lead coated copper gravel stop in lieu of aluminium <br /> SMMA review: proposal recommended. Pending roof design.Decislon required. 3,500 <br /> 3.5* Wood Siding: Prefinished prestressed fibreboard in lieu of cedar siding. Pending <br /> SMMA presentation on Sept. 20. Decision required. 280,000 <br /> 3.6* Roofing: Adhered EPDM in lieu of ballasted PVC. SMMA reconsidering the proposal. <br /> Presentation to be made on Sept. 20. $43,000 held in abeyance. Decision required. 0 <br /> 3.7* Reduce Exterior Wood Surfaces by 25 percentand increase CMU veneer. <br /> Proposal accepted but pending SMMA presentation on Sept. 20. Addition of <br /> $16,000 held in abeyance. Decision required. 0 <br /> 3.8* Omit Window Spandrels; Replace with Wood Siding. Proposal initially accepted. But <br /> SMMA proposed retention of this feature at B. Comm. meeting of Aug. 30. Saving of <br /> $23,000 held in abeyance. Pending presentation on Sept 20. Decision required. 0 <br /> 3.9 Six Inches of Roof Insulation instead of 4". Proposal not accepted; payback period <br /> considered too long. <br /> 4.1 Interior classroom dividing walls: GWB/metal stud instead of CMU. Proposal <br /> accepted. Original estimate included for GWB/metal stud; no saving accrues. 0 <br /> Sub-total 18,500 280,000 <br /> Page 2 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />