Laserfiche WebLink
Mashpee High School Project: Status of Value Management Proposals C hORI OU / ANDREW CHARTWELL&CO <br /> Item Proposal and Dinest of Committee's Decisions and SMMNs Subsequent Review Saving Addition <br /> Gen. SMMA's list of VE proposals with which it does not concur. Reasons to be provided. <br /> 1.1 Berm around Academic Wing. SMMA to review further and provide reasons why it <br /> disagrees with the VE Report. <br /> 2.1 Gym frame: timber beams and wood decking. Proposal not accepted. <br /> 2.2 Academic Wing: wood trusses in lieu of structural steel. Proposal not accepted. <br /> 2.3 Academic Wing: CMU and Concrete Plank in lieu of structural steel. Proposal <br /> not accepted. <br /> 2.4' External Overhang at Student Dining Area. Reviewed at Building Committee meeting <br /> September 13. Roofs to be reconsidered. Decision required. 32,000/ <br /> 2.5 Library Area Corridor Deletion. SMMA interim DD drawings of Sept 2 repeats <br /> corridors as the Schematic design. 0 <br /> 2.6' Simplify Academic Wing Roof. SMMA to make presentation on Sept. 20. <br /> Decision required. 13,000,-- <br /> 3.1 <br /> 3,000/3.1 Metal Stud Back-up Wall in lieu of CMU back-up.Proposal accepted but for a double <br /> layer of GWB with skim coat. Exception is the gymnasium. 200,000 <br /> 3.2 Reduce Skylights Over Admin. Area to 5 No. 8' x 8' units. Proposal accepted. 108,000 <br /> Sub-total 353,000 0 <br /> Page 1 of 12 Revision No. 4 for Building Committee Meeting of September 20, 1994 <br />