My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1994
>
1994-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 11:25:51 PM
Creation date
11/17/2016 3:30:50 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mashpee H. S. Project Management C uHART1< EL /ANDREW CHARTWELL & CO <br /> Summary Status of Decisions on Value Management Proposals <br /> - Revision No.4 - <br /> For presentation to Building Committee Meeting <br /> to be held on September 20, 1994 <br /> Page No. Saving I Addition <br /> 1 3530001 0 <br /> 2 185001 280000 <br /> 3 6980001 25000 <br /> 4 2795001 0 <br /> 5 1912001 0 <br /> 6 425001 44000 <br /> 7 1343201 21500 <br /> 8 5943001 0 <br /> 9 5043001 9000 <br /> 10 48000 14200 <br /> 11 03 0 <br /> 12 01 0 <br /> Sub-totals 1 28636201 393700 <br /> Ddt: adds 393700 <br /> Total 2469920. <br /> Taking the above into consideration, the over-run on budget reduces to: <br /> Reconciled value of Schematic Design 23,800,000.00 <br /> Net savings based on decisions up to September 14 (2,469.920.0% <br /> 21,330,080.00 <br /> Construction budget: 183,000 x $110.00 (20.130 000.00 <br /> Suggested remaining over-run 51 ,200,080.00 <br /> The above represents a betterment of $57,500 in the amount of the suggested over- <br /> run of $1,257580 as reported to the Building Committee on September 13, 1994. <br /> Value Management proposals marked with an asterisk (Item Nos. 2.4, 3.4, 3.5, 3.6, <br /> and 3.7) are due to be decided after, the presentation of the roof design and <br /> development of the red brick concept by SMMA. A second batch of proposals (Item <br /> Nos. 6.7, 6.8 and 6.1) are held pending a presentation of options on materials. And <br /> a third batch (Item Nos. 11.9a, 11.10, 11.12 and 11 .37) are awaiting the <br /> presentation of the final site plan. <br /> Items listed on Page Nos. 11 and 12, which have arisen since the presentation of <br /> the Value Management Report, have not been included in the above over-run <br /> calculations. The implications on budget will be reviewed when the proposals are <br /> developed and when cost information is to hand. A list of sundry items for which a <br /> decision is required, prepared by SMMA, dated September 14, 1994 is also <br /> attached. <br />
The URL can be used to link to this page
Your browser does not support the video tag.