My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1995
>
1995-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:08 PM
Creation date
11/17/2016 3:30:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MASHPEE HIGH SCHOOL BUILDING COMMITTEE <br /> TUESDAY, AUGUST 8 , 1995 <br /> TOWN HALL <br /> Members Present : Merry Sue Ahlgren, Bill Martiros , Janice Mills , <br /> Steve Greelish, Paul Griffin, Joe Polito <br /> Also Present : Jim Byrne , Tom Wren, Joel Seeley, Bill Barthelmes <br /> Meeting convened at 4 : 08 p . m. <br /> Chartwell Contract : Paul explained that Chartwell has agreed to <br /> do the prevailing wage work with no increase in their fee . The <br /> only remaining issue is overtime for the Clerk of the Works . Ian <br /> wants to settle it at a future date . Paul said it has to be done <br /> now. <br /> CONSTRUCTION STATUS <br /> Paul met with Jim Byrne and Herb , job Superintendent on Saturday. <br /> Things seem to be back on track. According to the schedule , they <br /> are behind on exterior walls but they have installed a lot of the <br /> footings . <br /> Mr . Barthelmes said they placed the last of the walls today for <br /> section A, B & E except for the pieces that need to remain open. <br /> The critical path date for structural steel is August 31 ( early <br /> start date ) . <br /> The foundations will be completed by then. <br /> Paul asked Jim his opinion of the status of the building and <br /> grounds . <br /> Jim said , as of today, sec A,B, & E is 99% done as Mr . Barthelmes <br /> said. If a lot of things go right , Aug 31st is doable . It will <br /> take aggressive action. He ,has been told they will be working 10 <br /> hours a day and Saturdays . Based on that , it is a little more <br /> doable by the 31st . <br /> There is also a process of paperwork that has to catch up. <br /> Tom said Chartwell will be looking very carefully at this and <br /> will come back at the end of the month as to where they stand. <br /> Joe asked what will prevent them from being done on the 31st? <br /> Tom does not see anything to prevent it , except shop drawings not <br /> being presented sufficiently in advance . <br /> Paul said Herb has circled items on the schedule they are ahead <br /> on, to show where they will be picking up time . <br /> Joe -asked what will prevent the steel from being here? <br /> Paul said only a production problem. There is a 2 week window <br /> for the start date . <br /> Mr. Barthelmes said he will be going to Springfield to the steel <br /> fabrication shop to see how things are going . <br /> Jim said to remember it is a sequence , Segment 1 is ready for <br /> 1 <br />