My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1995
>
1995-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:08 PM
Creation date
11/17/2016 3:30:57 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
used for the budget? <br /> Ed said Manny Tavares and John Childs have generated statistics , <br /> based on the number of schools they have worked on in the past, <br /> on how much each group costs per student. <br /> Paul asked Dr . Demoura the status of the principal ? <br /> He said the search committee is still looking and hope to have a <br /> person on board by July 1 . <br /> Steve said his concern is that everything will get done and then <br /> they will have to go back to put data systems in . If it is all <br /> closed up , you will pay for it. <br /> Paul suggested developing a detailed timeline for FF & E to ease <br /> some of these concerns . A timeline of when decisions must be <br /> made. He asked Ed Frenette to develop a timeline to include: <br /> - specs on next consultant phase <br /> - when that consultant has to be hired <br /> - look at all items in the 3/29 memo: when do decision need to <br /> be made on all those items . Some decisions need to be made ahead <br /> of others. <br /> Joe asked if there is a capability for lap tops in the wiring? <br /> Ed said you can connect lap tops to the desk top . <br /> Joe asked if there is the capability in the seating arrangements? <br /> Ed said that is a problem that will have to be solved in a bigger <br /> way . There will be wireless communications, for computer <br /> capability at every desk . No one is predicting and " interim <br /> phase" with power poles . <br /> Paul agreed it will be wireless . <br /> Joe asked Ed to thank Joel for his report on the drawing review <br /> comments. <br /> OFF SITE IMPROVEMENTS <br /> VHB submitted a break down of fees : <br /> $15200 for phase I <br /> $21 , 500 for phase II . <br /> Paul explained the Committee needs to have it broken down per <br /> intersection . <br /> The Cape Cod Commission wanted to know what the town would do to <br /> solve all the issues in the traffic study report. VHB was <br /> supposed to tell us what it would take to get all of that work <br /> designed . Greg Taylor thought it would be cheaper to get it <br /> designed all at one time, then the town could act on it in <br /> phases . Greg said he would talk to VHB about it. <br /> Ed said VHB must have misunderstood the direction . He will <br /> organize a conference call between VHB, SMMA and a Committee <br /> representative. <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.