My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1996
>
1996-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:49 PM
Creation date
11/17/2016 3:31:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Merry Sue asked about the railing at the corridor, the sheetrock <br /> is all broken? <br /> Jim said they are doing repair work to the railing , the fill on <br /> the bottom is not yet completed. <br /> CONSTRUCTION PROGRESS <br /> Stone said they will have all of section A, B & E ready to <br /> inspect by the end of this week. SMMA has to do an above ceiling <br /> punchlist in C & D this week. <br /> SMMA did a punchlist for derrick 1 and Stone has completed almost <br /> all the work, only minor items and paperwork are still due . <br /> There was a meeting with Stone , their attorney, the bonding <br /> company and Paul on Friday morning . They discussed the definition <br /> of substantial completion. The contract clearly defines what it <br /> completion is . Presently, the best date for substantial p letion for A,B <br />' & E is August t 23rd. <br /> Merry Sue asked if we can use the building without an occupancy <br /> permit? <br /> Paul said the building inspector was at Friday' s meeting . He <br /> does not think there is a problem with that until September 4th, <br /> when the students arrive . <br /> The Committee reviewed the plans which are marked with red lines, <br /> for where a snow fence will be installed to keep students out of <br /> construction areas . Purple areas are site work that must be <br /> finished before school opens , except possibly for the shrubbery. <br /> The large trees and seeding will be completed. <br /> Section C & D are close but Paul does not think they will be <br /> ready for Sept . 4th. Cafeteria equipment is going in now, should <br /> be finished by 16th. Gym ceiling goes in on the 14 , 15th. They <br /> are presently sanding the floor. <br /> There is still a lot of work in the shower areas . Epoxy floors <br /> were supposed to start today. <br /> Stone was told we want the auditorium ready by October 6th ( for <br /> Oct 7th town meeting) but they weren' t sure they could make it. <br /> They painted the above ceiling the wrong color. <br /> Mike Pietrowski asked if there is any scaffolding or walkway to <br /> reach the lighting , in the auditorium? <br /> Paul said there is a special rig you can rent to go between the <br /> chairs to reach it . <br /> Mike asked if the lights at the stage are changeable? <br /> Paul said the light work is not yet completed, it will be taken <br /> care of. There is a tremendous amount of work left in there . <br /> Art areas : there is drop ceiling work and clean up remaining . <br /> Steve asked about the status of the bathroom wall? <br /> 4 <br />