Laserfiche WebLink
Paul said we are owed an enormous amount of training . They will begin to <br /> schedule it . He strongly suggests it is video taped . <br /> Janice suggested that very soon we ask Mike Pietrowski to video tape the <br /> High school with a running commentary and put it on the educational <br /> channel . <br /> Paul added that once the classrooms are set up, have some still photos <br /> taken, including the exterior and set up a board at town meeting . <br /> Mike Pietrowski will get the photos done . <br /> Mike said the high school channel will be 75 . <br /> Miscellaneous Matters <br /> - acid neutralization tank, 2 weeks ago the plumber said it would be done <br /> in two weeks . Joel said they have received shop drawings and sent them <br /> back. <br /> - Spare lamps . Joel sent a letter to Stone and after reviewing their <br /> response found the value to be unacceptable . He gave them guidelines but <br /> they have not responded back. <br /> Paul suggested in may be in the schools best interest to take the credit in <br /> product since the money goes back to the town. <br /> Steve said they should negotiate on how much overage of product to cover <br /> the labor costs . <br /> - Superintendents office : Paul spoke with Stone today. They will make calls <br /> tomorrow to get it going. <br /> - Duel Fuel meeting : Steve met with the Cape Cod Commission to relocate the <br /> tank in the area behind the mechanical room. They were very favorable to <br /> that . It doesn't look like the town will ever develop the P1 well . We will <br /> have to file a modification when we are ready. Steve suggested design <br /> build and seek the architects assistance in putting together the <br /> specifications . <br /> Joel will prepare a proposal for SMMA' s assistance . <br /> Merry sue asked how much this will cost? <br /> Paul said we won' t know until we put it out to bid. <br /> Steve wants to keep it a simple design. All above ground, conventional <br /> tankage which has to be covered with a bunker underneath. There needs to be <br /> a system to detect leakage . <br /> (Jim left the meeting at 6 : 00 p.m. He thanked the Committee for the <br /> flowers that they sent . ) <br /> CHANGE ORDER <br /> Joel presented change order #23 for $4 , 310 for: <br /> - relocation of drywall petition in stair #1 & 4 <br /> - provide coupling valve for irrigation system as recommended by Dan <br /> Solien. <br /> ** Paul made a motion to forward to the Selectmen for their approval <br /> change order #23 for $4 , 310 . Merry Sue seconded the motion. <br /> All members were in favor 5-0** <br /> 8 <br />