My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-HIGH SCHOOL BUILDING COMMITTEE
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL COMMITTEE
>
HIGH SCHOOL BUILDING
>
1990-1999
>
1996
>
1996-HIGH SCHOOL BUILDING COMMITTEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:16:49 PM
Creation date
11/17/2016 3:31:01 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
Meeting Date
12/31/1996
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ' <br /> 1Fr <br /> ** Paul made a motion to authorize SMMA to hire a <br /> consultant, OccuHealth Inc . , to review the mold and <br /> related health conditions in the building, to be paid <br /> from the re-imbursables account . Merry Sue seconded the <br /> motion. All members were in favor 6-0 . ** <br /> CHANGE ORDERS <br /> ** Paul made a motion to forward to the Selectmen for their <br /> approval change order #18 for $15 , 106 . for: <br /> - removal of unacceptable sub soil material <br /> - modify elevator roof vent framing <br /> - add fire rated door <br /> - add 3 way value. <br /> ** Merry Sue seconded the motion. <br /> 1 . Clay was found at the bus drop off area and it has to be <br /> removed - $12 ,000. <br /> 2 . It was discovered during review of the shop drawings <br /> modification to the elevator roof vent framing was needed. <br /> 3 . There were two fire rating doors that were not shown as such <br /> on the drawings. <br /> 4 . A 3 way valve is need for an air conditioning unit $100 . <br /> Joe asked if any of these are omissions or errors? <br /> Paul said the soil is not, the others are minor but they will be <br /> reviewed. <br /> ** All members were in favor 6-0 . <br /> NEXT SCHEDULED MEETING IS JUNE 25TH, 4 : 00 p.m High School site <br /> There may be an additional meeting next Tuesday to discuss <br /> technology. <br /> Bill said there are 2 rooms that have 6-8" diameter posts <br /> showing, will they remain exposed? <br /> Joel said they will , they will be painted. <br /> Bill said the shelf over the computer counter is particle board, <br /> he thought we were buying wood. <br /> Joel said what ever was speced was provided. Particle board is <br /> acceptable for that use . <br /> Paul said we told Manny Tavares we didn't want press board in the <br /> cabinets but he doesn't know if we said anything about the shelf. <br /> Steve said the sound system in the gym, which was discussed with <br /> Cavanaugh Tocci , is not what is speced. <br /> Joel said the gym was a PA system. He will look at his notes <br /> from that meeting and talk to the consultant again. He does not <br /> remember the details . <br /> John Williams asked if the library collection falls under Manny <br /> Tavares ' responsibility? He thought it did. <br /> Paul said if it is not now in his contract, it will not be a <br /> problem putting it in. <br /> Joel will look into it and get it resolved ASAP. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.