Laserfiche WebLink
1 <br /> Masbpee High School Project lVlanagement <br /> kpdgPtPacommitte <br /> Total Estimated Cost: 2 00,004. <br /> r <br /> ' <br /> Construction and Site: 20,130,000i 18,090 <br /> Design Improvements: 840 1000 000 :; z <br /> Off-Site Improvements: 200,000 <br /> Total Building and Site Budget: }, 7(, 19,29 ;tx <br /> Furniture, Fittings Rt Equipment: Z,gQ()x , £ 'e� 0 <br /> x <br /> Architect (Design and Construction) 114541000 1,454,000 <br /> Project Manager (Design) 245,620 245 620 <br /> Project Manager (Construction) allow 200.IIflQ 120+00Q T. <br /> Total Consultants' Fees, say }g04 {1(}(j62 <br /> s <br /> Survey 16,500 <br /> Topographical 10 <br /> N <br /> Geotechnical 13,000 'z' '<M E_' <br /> Clerk of Works 140,000 s � , <br /> Testing <br /> Bid Printing 40 000[ ' <br /> i. <br /> Administration Expenses 22,000 <br /> Site Study 50 <br /> Title Search 2 <br /> PP <br /> A sisals 80,000 <br /> Legal <br /> Educational Consultant. 25 000 <br /> Miscellaneous 88.300 <br /> n <br /> Total Reimbursables: � T740,U4Q <br /> R <br /> KT <br /> „ Ni <br /> Construction Contingency (5% of$23.97m) <br /> Y d h <br /> Land Purchase <br /> x <br /> TOTAL: <br /> Ad, <br /> (1) Contingency for value added <br /> - TOTAL P.Ol <br /> i <br />