Laserfiche WebLink
NOV-28-95 TUE 12:33 0MA/SYMMES-MA1N1&MCKEE- - FAX N0,-i-6173545758 - - - P-02- - <br /> 1` we cu•+EcrycF fx0'xEenine s+e w+F O'C •lnxxix. nesoyw CF9 <br /> SMMA `l, Symmn Mein 6 McRu Anoclates MEMORANDUM <br /> CwMew•Oc[.uw p.•nx EnoOVe.rwx <br /> To: Joel Seeley Date: 11/27/95 <br /> kmn: Pat Halm Rolex No.: 94023 <br /> Project Mashpee High School <br /> Re: Annual energy costs (Revised) <br /> D.:t.�but�on: RG,ESD,DS, MJA(MF) <br /> In my memo to you on November 02,we included several numbers,that, upon more rigorous analysis do <br /> not stand up. <br /> As before,it is our understanding that the High School will operate and be charged by Commonwealth <br /> Electric Cunrpwiy based upon their"Medium General Time-of Use"Rate G2 also known as Rate 84. <br /> Based on this rate, the first years cost for electrical energy will be as follows: <br /> Interior Lighting $ 52,000 <br /> HVAC Equipment 72,800 <br /> Building total $124,800 <br /> Exterior Lighting 7,610 <br /> Site total $ 132,410 <br /> As before,it is our understanding that the High School will operate and be charged by Colonial Gas <br /> Company based upon their"Commercial and Industrial LA w Lead Yactur"Rate C-42 <br /> Based on this rate,the first years cost for gas energy will be as follows: <br /> Pleating $ 91,000 <br /> Domestic hot hater 2,500 <br /> Building total $93,500 <br /> The total cost for the Building,therefore,will be$218,000 or about$ 1.20/SF, exclusive of the exterior <br /> lighting.The differcuce between this and what we submitted previously is due to transcription errors.We <br /> included some parts of the systems twice. <br /> 1a0�r % 1995 <br /> PEH/pch/M-ENRGY2.D0c <br /> 1000 Maasachnaclta Avccus,Oamb+idec,M014.VhaaEth 02135 017.547.5400 Fac.754.5758 <br />