My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NA-MASHPEE HIGH SCHOOL PROJECT MANAGEMENT
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
>
NA-MASHPEE HIGH SCHOOL PROJECT MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 4:04:24 PM
Creation date
11/17/2016 3:31:09 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM <br /> Project Site Office <br /> Tel 508 4777557 <br /> Fax 508 477 4184 <br /> Mashpee High School Project Management <br /> Mr. Paul Griffin <br /> Opinion: Due Completion of the Contract and Opening of the School <br /> Page 2 of 3 <br /> 11th June 1996 <br /> 2. Practical Considerations to Facilitate Beneficial Occupancy <br /> From a practical standpoint, our opinion is that, provided sustained pressure is <br /> brought to bear on Stone, occupation of the class rooms is possible sometime in <br /> August or the first two weeks of September 1996. As we have not received a <br /> substantial completion plan from Stone (which was due on 5th June 1996), we are <br /> not presently in a position to provide a more accurate date. We would stress that this <br /> assessment is conditional upon Stone exerting its utmost efforts for the next eleven <br /> weeks, action which will most probably entail the widespread use of overtime and <br /> weekend work. We would also point out that the school administration should expect <br /> severe congestion in the weeks immediately prior to school opening due to the <br /> competing demands of punch list work and furniture and equipment delivery. <br /> Without the rapid development and implementation of a comprehensive completion <br /> plan, we would be concerned that, even with an extended working week, the school <br /> may not be available when it is required. For example, the Sewage Treatment Plant, <br /> which should have been operational by 1st May 1996, requires an input from a <br /> number of agencies before a Clear Water Certificate will be issued. Ideas are abroad <br /> to provide a temporary solution but a plan for all to ,see has yet to be provided by <br /> Stone. Likewise, agreement on what siteworks will be complete is equally pressing. <br /> Inside the Academic Block the class rooms are at a relatively advanced state of <br /> completion, Derricks 1 and 4 in particular. Page 3 of this opinion contains a summary <br /> list of the activities necessary to the achievement of beneficial occupancy of the class <br /> rooms and science laboratories. The Architect has a more developed list and we are <br /> aware that a preliminary punch list has been prepared by LibertyBond Services. <br /> We are less confident that the administrative area, including the library, will be <br /> available in the timescale which we have indicated. Derrick 6 is not yet weather tight, <br /> bacterial growth is evident at a number of locations, pipework in the library ceiling <br /> area has not been corrected and drywall in E103/E104/E105 has yet to be <br /> completed. We envisage a scenario where the classrooms could be occupied but that <br /> work would still be ongoing in Derrick 6. In essence, trailers might be necessary to <br /> house the administrative staff provided blocking off the administration area is <br /> acceptable to the Architect and the Building Inspector. <br />
The URL can be used to link to this page
Your browser does not support the video tag.