My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NA-MASHPEE HIGH SCHOOL PROJECT MANAGEMENT
TownOfMashpee
>
Town Clerk
>
Minutes
>
SCHOOL - HIGH SCHOOL BUILDING COMMITTEE
>
NA-MASHPEE HIGH SCHOOL PROJECT MANAGEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2021 4:04:24 PM
Creation date
11/17/2016 3:31:09 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SCHOOL
Meeting Document Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEMORANDUM char M%n aH <br /> Project Site Office <br /> Tel 508 4777557 <br /> Fax 5084774184. <br /> Mashpee High School Project Management - <br /> Mr. Paul Griffin <br /> Opinion: Due Completion of the Contract and Opening of the School <br /> Page 3 of 3 <br /> 11th June 1996 <br /> 3. Summary List of Items Necessary to Substantial Completion or Beneficial Occupation <br /> of the Academic Block <br /> 1. The entire sealing of the building and closing off of the Academic Block from the <br /> remainder as outlined to Stone by SMMA and the Building Inspectorate on 30th <br /> May 1996, including internal caulking and completion of window cills. <br /> 2. Completion of all roof, flashing and gutter items. <br /> 3. Completion and start-up of the mechanical systems in accordance with <br /> procedure to maintain the building in an environment suited to the needs of the <br /> finishings trades; energisation of power throughout the building. <br /> 4. Replacement of damaged or damp drywall. <br /> 5. Residual action in providing satisfactory hangers for mechanical services. <br /> 6. Remainder of casework, particularly to the laboratories. <br /> 7. Internal glazing and door hardware. <br /> 8. Chalkboards and noticeboards. <br /> 9. Final coat of paint to all areas including CMU in entrance lobbies. <br /> 10. Ceilings. <br /> 11 . Carpets in classrooms; tiles in corridors. <br /> 12. Skirtings. <br /> 13. Electrical final fix including activation of clocks and sundry devices. <br /> 14. Installation of lockers in corridors. <br /> 15. Testing and commissioning of all life safety and annunciation systems. <br /> 16. Signage. <br /> 17. Bathrooms completion including epoxy floors, partitions and fittings. <br /> 18. Testing and commissioning of plumbing, drainage and sewage lines. <br /> 19. Testing and commissioning of the sewage treatment plant. <br /> 20. General cleaning of entire area to be handed-over. <br /> 21. Telephone system installation and commissioning (not Stone work). <br /> Information supplemental to the above will be provided verbally during today's Building <br /> Committee meeting. <br /> CC Tom Wren and Jim Byrne -Chartwell. <br />
The URL can be used to link to this page
Your browser does not support the video tag.