Laserfiche WebLink
5. There was no evidence of adequate treating of the <br /> septage. <br /> 6. Inadequate evidence was presented to determine the <br /> actual impact on the schools and other services of the Town. <br /> 7. The plan called for an inadequate number of parking <br /> spaces in violation of the present zoning by-laws. <br /> 8. The projected Sanitary Landfill is going to be abutting <br /> the proposed location= that there could be a significant amount of <br /> water extracted from the ground which could have an impact on the <br /> flow of leechates, which could be concentrated and pool and easily <br /> contaminate the source of water, not only to the proposed units, <br /> but to the Pilgrims Pride Nursing Home, which is abutting the <br /> proposed site. <br /> -3- <br />