Laserfiche WebLink
ii <br /> i <br /> lations of this Section 9, 5 so as to allow use of the <br /> land as a Planned Retirement Community. <br /> 9.583 The Board of Appeals shall render a dec.islon within <br /> ` sixty (60) days of the date of hearing. <br /> 9. 584 The Board of Appeals may, in approving a PRC, im- <br /> pose such terms and conditions as the Board of Appeals <br /> shall deem necessary to accomplish the reasonable apnli- <br />` � cation of the standards provided in this Section <br /> 9. 585 Upon the allowance of a PRC by the Board of Appeals <br /> i under this Section 9 . 5 : F <br /> A. The developer may develop the site in sections , and <br /> at or after submission to the Board of Appeals for <br /> approval of the Master Site Development plan, the ' �� is , <br /> developer shall submit to the Planning Board for <br /> approval Final Site Development Plan (s) for the <br /> section (s) which it intends to develop. In con- <br /> nection with each Final Site Development Plan, , <br /> there shall be submitted to and approved by the <br /> Planning Board the plans and information required <br /> by Section 9. 3824, Certificate (s) of occupancy � � ' <br /> may be withheld until the construction as required <br /> in each section under Section 9. 382 P4 and other Parts ip ? <br /> Of Section 9p5, where said Sections are applicable, <br /> has been completed or provided for. � ! <br /> B. The Final Site Development Plan (s) shall be approved , ' ' <br /> by the Planning Board if in general conformity to <br /> ' the easter Site Development Plan, patterns and uses- �1 <br /> as theretofore approved by the -Board of Appeals and <br /> if in conformity to the applicable rules and regu- <br /> lations of the Planning Board. <br /> C. Each Final Site Development Plan shall show by metes <br /> and bounds the entire perimeter of the section of , <br /> the PRC then proposed to be developed, and all <br /> buildings, to be erected in said section of the PRC, <br /> together with the types of buildings to be erected <br /> therein with an identification key. gypp ' <br /> 9. 586 Where the developer proposes to develop a PRC 4 � <br /> Pursuant to a subdivision as to which approval of the <br /> Planning Board is required under the Subdivision Control <br /> Law, the developer shall comply with Section 9. 38 of this <br /> By-Law in lieu of Section 9. 585. <br /> 9. 587 An of the Board of Appeals for use of land <br /> as a Planned Retirement Community under this Section 9 .5 <br /> shall become void if the developer has not applied for <br /> a building permit with respect to a section of the land f <br /> shown on the Master Site Development Plan within three F ' <br /> (3) _years from the date of such approval. Construction � <br /> of the first section shall commence within one (1) year <br /> after all local, state and federal governmental permits 6 ? <br /> and approvals with respect to the PRC have been obtained; ,; <br /> -37- <br />