Laserfiche WebLink
s Y6 3 <br /> j <br /> lations of this Section 9. 5 so as to allow use of the <br /> land as a Planned Retirement Community. ` ! <br /> 9. 583 The Board of Appeals shall render a decision within ` <br /> sixty (60) days of the date of hearing. <br /> 9. 584 The Board of Anneals may, in approving a PRC, im- <br /> pose such terms and conditions as the Board of Appeals <br /> shall deem necessary to accomplish the reasonable' - appli- <br /> cation of the standards provided in this ,Section 9.-5' -.' ! <br /> 9.585 Upon the allowance of a PRC by the Board of Appeals <br /> under this Section 9. 5 : <br /> A. The developer may develop the site in sections , and <br /> at or after submission to the Board of Appeals for <br /> approval of the Master Site Development plan, the <br /> developer shall submit to the planning Board for <br /> approval Final Site Development Plan (s) for the 4F ' <br /> section (s) which it intends to develop. In con- <br /> nection with each Final Site Development Plan, y <br /> there shall be submitted to and approved by the , <br /> Planning Board the plans and information required k <br /> by Section 9. 3824. <br /> Certificate (s) of occupancy <br /> may be withheld until the construction as required <br /> in each section under Section 9, 3824 and other marts <br /> of Section 9. 5, where said Sections are applicable, <br /> has been completed or provided for. <br /> B. The Final Site Development Plan (s) shall be approved � <br /> by the Planning Board if in general conformity to <br /> the Piaster Site Development Plan, patterns and uses. I ' ` <br /> as theretofore approved by the Board of Appeals and <br /> if in conformity to the applicable rules and regu- <br /> lations of the Planning Board. <br /> C. Each Final Site Development Plan shall show by metes <br /> and bounds the entire perimeter of the section of <br /> the PRC then proposed to be developed, and all au <br /> buildings to be erected in said section of the PRC, i � ; ' <br /> together with the types of buildings to be erected iIA <br /> therein with an identification key. <br /> 9. 586 Where the developer proposes to develop a PRC <br /> Pursuant to a subdivision as to which approval ofthe ?l: � <br /> Planning Board is required under the Subdivision Control 6 <br /> Law, the developer shall comply with Section 9. 39 of this ' ° <br /> By-Law in lieu of Section 9. 585. n, g <br /> 9. 587 Approval of the Board of Appeals for use of land <br /> as a Planned Retirement Community under this Section 9.5 <br /> shall become void if the developer has not applied for <br /> a building permit with respect to a section of the land <br /> shown on the Master Site Development Plan within three x <br /> (3) years from the date of such approval. Construction <br /> of the first section shall commence within one (1) year I <br /> after all local, state and federal governmental permits is <br /> and approvals with respect to the PRC have been obtained; <br /> -37- <br /> I <br />