My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-1986-ZONING BY-LAWS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BY-LAWS
>
1980-1989
>
1986
>
1983-1986-ZONING BY-LAWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 7:12:41 PM
Creation date
12/19/2016 9:59:46 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BY-LAWS
Meeting Document Type
Minutes
Meeting Date
12/31/1986
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
363
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> h <br /> provided, that there shall be excluded in computing said one (1) , <br /> year period any period during which the granting of any such permit <br /> or approval is being appealed or otherwise contested. In the event <br /> construction of the PRC has not been substantially completed ten � . <br /> (10) years from the date that all such permits and approvals have <br /> been obtained, computed as set forth above, then the developer shall <br /> reapply for approval for the remaining undeveloped area under this <br /> Section 9.5. <br /> 9.59 Miscellaneous. , <br /> 9.591 The Building Inspector may revoke a building permit issued <br /> under this By-Law in case the builder or developer fails to conform <br /> to the plans and schedules as approved. <br /> 9.592 If any provisions of this Section 9.5 shall be found to con- N , <br /> flict with any other provision of this By-Law, such conflict shall <br /> be resolved in favor of this Section 9.5. <br /> 6� Y <br /> 9.593 If any section, subsection, or other portion of this Sectioni <br /> 9.5 shall be adjudged invalid, the remainder of this Section 9.5 <br /> shall be deemed not to be affected thereby and shall continue to <br /> be in full force and effect. <br /> 9.6 DESIGN REVIEW COMMITTEE - A Design Review Committee shall be established to <br /> advise the Planning Board and Board of Zoning Appeals on matters of archi- <br /> tectural and design concern in the review of applications for special permits <br /> for developments in the R-4, C-2, I-1, C-1, C-1-SV Incentive, and C-1-0 <br /> Incentive Zoning Districts. Architectural and design concern shall include 4 <br /> but not be limited to: site planning, building placement, building size, Nd ', <br /> design compatibility, exterior appearance, construction materials and finishes , <br /> parking and roadways, landscaping and site grading, building entrance and <br /> exit placement and signs. <br /> The Design Review Committee will sit with the Planning Board and Board of ski <br /> Zoning Appeals in any public meetings dealing with development proposals in GI! ` <br /> the R-4, C-2, I-1, C-1, C-1-SV Incentive, and C-1-0 Incentive Zoning Districts. <br /> The Design Review Committee may call special meetings of its own to review' <br /> All <br /> applications. Findings of the Design Review Committee shall be advisory to <br /> the Planning Board and Board of Zoning Appeals. Full power for granting or <br /> denial of applications for special permits shall remain with these Boards. ; « <br /> Membership of the Design Review Committee shall consist of three persons. . Ids <br /> one each from the Planning Board and Board of Zoning Appeals and a third <br /> member to be appointed by the Board of Selectmen. The Planning Board member yl <br /> shall be appointed by the Planning Board Chairman, and the Board of Zoning _ <br /> Appeals member shall be appointed by the Chairman of the Board of Zoning <br /> Appeals. The third member of the Design Review Committee shall be an <br /> architect, landscape architect or professional civil engineer registered in <br /> the Commonwealth of Massachusetts. In the event that no such person isr <br /> available, the Planning Board shall retain for compensation the services of <br /> a registered architect landscape architect or , <br /> p professional civil engineer, <br /> Compensation for such a person shall be set by the Planning Board and shall <br /> be covered by fees the Planning Board establishes for filing applications <br /> for special permits in the R-4, C-2, I-1, C-1, C-1-SV Incentive and C-1-0 <br /> Incentive Zoning Districts. i'� <br /> �qqk <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.