Laserfiche WebLink
dated by the above agency) for a period of not less than <br /> twenty (20) years, and except that this exemption shall apply <br /> only to the first one hundred (100) of such units for which <br /> building permit applications are made in any year. The pro- <br /> visions of Section 6.4 shall also not apply to special <br /> permits protected, or lots in subdivisions temporarily pro- <br /> tected, from the provisions of this section by Massachusetts <br /> General Laws Chapter 40A, Section 6. <br /> 6.4.3.2 The provisions of Section 6.4 shall not apply to non- <br /> residential structures or foundations, accessory structures, or <br /> alterations, reconstruction or additions which do not create a <br /> new dwelling unit, but shall apply to residential foundation <br /> permits. <br /> ; j <br /> 6.4.4 Administration <br /> 6.4.4.1 The Building Inspector shall compile and keep up-to-date a <br /> listing of all subdivisions, special permit projects and <br /> . other lands which are exempt or protected temporarily from the <br /> provisions of Section 6.4 either under Subsection 6.4.3 or <br /> under any applicable provisions of Massachusetts General Laws <br /> and the date on which any temporary protection will expire. <br /> 6.4.4.2 The Building Inspector shall determine prior to January 15 of <br /> any calendar year the number of existing dwelling units in the <br /> Town on, plus any dwelling units for which building permits <br /> were issued by, December 31 of the previous year which have not <br /> expired: On the basis of that information and the provisions <br /> of Subsection 6.4.2.1 he shall determine the number of dwelling <br /> units not exempted by Subsection 6.4.3 which may be issued <br /> permits during said calendar year. <br /> 6.4.4.3 Applications for building permits for new dwelling units may be <br /> filed only during the first fifteen (15) days of any month. <br /> However, no such permits will be approved until after the <br /> fifteenth day of the month to allow proper review and deter- <br /> mination of the order of priority in which they may be issued. <br /> Permits which are exempted by Subsection 6.4.3 or temporarily <br /> protected by Massachusetts General Laws from the provisions of <br /> this section may be applied for or issued at any time. <br /> 6.4.4:4 In issuing building permits, the Building Inspector shall first <br /> determine that the application and proposed structure conforms <br /> with the rules and regulations of the Board of Health, with any <br /> applicable building codes and with this Zoning By-Law, includ- <br /> ing the provisions of Subsections 6.4.1 . For those applications <br /> which are in conformance and may otherwise be issued, building <br /> permits shall be issued, within the monthly limit, in the <br /> following order of priority: <br /> First - Provided that the annual limit has not been exceeded, <br /> in the order of their receipt by the Building <br /> Inspector, applications for individual single-family <br /> 6 - 18 <br />