Laserfiche WebLink
regarding drainage and ground water quality <br /> shall be incorporated into the conditions of <br /> any OSID special permit and into the <br /> subdivision review process of the Planning <br /> Board. <br /> 9 . 3 .6 PHASING, EXPIRATION AND EXTENSION - An Open Space <br /> Incentive Development may be subdivided , developed <br /> and constructed in phases according to a phasing <br /> schedule approved by the Planning Board as part of <br /> the OSID special permit . Within any OSID , no more <br /> 1 than fifty (50 ) residential units , or twenty (20 ) <br /> percent of the total number of residential units <br /> approved under the special permit , whichever is <br /> greater , may be constructed during any calendar <br /> year and building permits shall not be issued for <br /> more than that number of units . The phasing <br /> -� schedule shall be included in the master plan of <br /> the OSID and shall indicate the surveyed and <br /> bounded open space area required by subsection <br /> 9 . 3 . 3 .3 , the approximate boundaries of each phase <br /> =i for which subdivision approval will be sought ( if <br /> subdivision is to be done in phases ) and the <br /> proposed year of such subdivision application , the <br /> general location of all roads projected to carry <br /> Jover two hundred (200) vehicles per day and the <br /> ! proposed year of their construction , the general <br /> location of any proposed recreation facilities , <br /> road improvements , sewage treatment plants , <br /> commercial uses and similar major structures and <br /> amenities and the year in which they are proposed <br /> tv be built , and a general master plan showing the <br /> clusters or areas of residential development and <br /> the number and type of residential units approved <br /> for development within each area . Where the <br /> developer of an OSID continues to file definitive <br /> plans of each phase , constructs required <br /> improvements , and performs all other actions <br /> required by the special permit and this by-law in <br /> conformance with the phasing schedule , the special <br /> permit shall remain in effect . <br /> Otherwise , a special permit for an Open Space <br /> Incentive Development shall become void if the <br /> developer has not applied for a building permit for <br /> or constructed the proposed improvements contained <br /> 1 in the phasing schedule and conditions of the <br /> permit within two years of the dates specified on <br /> the phasing schedule excluding any time required to <br /> pursue or wait the determination of an appeal . If <br /> the permit does become void , there shall be no' <br /> effect on the ownership and location of the <br /> required open space areas or on the number of units <br /> originally approved under the bonus provisions of <br /> this Section . However, the developer shall <br /> r,. <br /> 9 - 14 <br />