My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1986-1999-ZONING BY-LAWS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BY-LAWS
>
1980-1989
>
1999
>
1986-1999-ZONING BY-LAWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2017 4:22:49 AM
Creation date
12/19/2016 10:00:21 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
ZONING BY-LAWS
Meeting Document Type
Minutes
Meeting Date
12/31/1999
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> height." <br /> Replace the current wording of Subsection F with the following: <br /> "F.No site for such use may have more than one(1)direct vehicle access way to Routes 28 or 151 or more <br /> than two(2)direct vehicle accesses to any other abutting street not created as part of the commercial <br /> center, and such access ways,shall intersect the abutting street at a ninety(90)degree angle,unless the <br /> Planning Board approves a different intersection angle. Additional access ways may be approved by the <br /> Planning Board,where they are found to be necessary for reasons of safety or proper traffic flow. Where <br /> the commercial center will be subdivided into multiple lots,there shall be no direct vehicle access from any <br /> individual lot within the development onto Route 28,Route 151 or Great Neck Road North. <br /> i <br /> A traffic impact report,indicating projected traffic flows from the project at its buildout,projected traffic <br /> flows and levels of service on nearby roadways in 5 years and at buildout of the development,current <br /> traffic flows,levels of service and accident records for said roadways,projected capacity,service level and <br /> safety problems anticipated in 5 years and at project buildout,proposed mitigation measures and <br /> approximate costs in current dollars and other relevant information shall be submitted as part of the <br /> application and explained to the Board at a public meeting by a competent professional traffic engineer or <br /> transportation planner. The Planning Board may require traffic signals,traffic or turn lanes,sidewalks, <br /> bikeways or any other mitigation measures that it believes necessary to protect public safety and maintain <br /> proper traffic flow on roadways within or impacted by the development. <br /> Streets and drives within the development shall be constructed in accordance with the provisions of Section <br /> 174-46.E.(6),except that the Board may vote to waive portions of that section if it determines that such <br /> waiver is warranted and would not have an adverse impact on public safety or the other purposes of this <br /> bylaw, or to require additional sidewalks,traffic lanes,tum lanes,traffic signals or other items as <br /> necessary. In addition,projected traffic may be calculated on the basis of firm projections of commercial <br /> uses and floor areas when available,on the basis of 166 average weekday trip ends per 1000 square feet of <br /> gross leasable floor area, or on shopping center vehicle trip generation rates contained in the latest edition <br /> of"Trip Generation"by the Institute of Transportation Engineers. In performing such calculations where <br /> there is no firm estimate of gross leasable floor area, estimated area shall be calculated based on twice the <br /> maximum lot coverage allowed for the project." <br /> Add the following new paragraphs to Subsection H: <br /> "The Planning Board may require that a schedule of architectural,signage and/or landscaping controls be <br /> adopted for the development,enforceable by the Town's special permit authority as well as deed <br /> restrictions on the development and any lots to be sold,in lieu of specific building,signage and landscape <br /> designs for all portions of the project. Such controls shall have the effect of promoting design that is in <br /> keeping with the character of the Town and of Cape Cod. <br /> Any proposed schedule of architectural,signage and landscaping controls shall require review by the <br /> Design Review Committee and their report to the Planning Board prior to approval of the special permit <br /> application for the development. <br /> If such a schedule of architectural,signage and/or landscaping controls is required,it shall be recorded as <br /> a deed restriction on the property at the same time as the special permit is recorded and the Planning Board `- <br /> shall be provided forthwith a copy of the recorded documents indicating the registry book and page at <br /> which each is recorded." <br /> Add new Subsections I and J as follows: E n <br /> i <br /> r <br /> 'T Within any commercial center located on a parcel of land greater than 200,000 square feet in the C-1,C- <br /> 1-0 or C-1-SV districts,the Planning Board may approve subdivision lots of any size pursuant to the <br /> x'= <br />
The URL can be used to link to this page
Your browser does not support the video tag.