Laserfiche WebLink
4. All sewage system plans shall be submitted to <br />the Mashpee Board of Health. <br />5. Proper lighting of the <br />development shall have <br />Planning Board. <br />main road through the <br />the approval of the <br />6. The construction of the 90,condominium units <br />shall be phased over a minimum of 2 years. <br />VOTE: UNANIMOUS <br />..RECEIVE <br />'' 1 1 1974 <br />MASHPEE TOWN CLERK <br />