My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987 JAN-JUN-ZBA APPEALS
TownOfMashpee
>
Town Clerk
>
Minutes
>
ZONING BOARD OF APPEALS
>
1980-1989
>
1987
>
1987 JAN-JUN-ZBA APPEALS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 3:16:22 PM
Creation date
12/19/2016 10:01:41 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
307
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 <br /> Evidence was received during the hearing which indicated that lot <br /> 14 has a house on it. It was further indicated that the Applicant Mr. <br /> Sullivan had gone before the Conservation Commission and received an <br /> order of Condition for the construction of a house on Lot 14. The evidence <br /> further indicated that a Building Permit had issued but that a Stop Work <br /> Order had issued by the Conservation Commission as the project did not <br /> conform to the plans approved by the Commission: It was noted that the <br /> Conservation Commission had been erroneously informed by Mr. Sullivan that <br /> a variance had been granted under Section 11A for location of the dwelling <br /> within 100 feet of the River. Evidence was further received that D.E.Q.E. <br /> had issued a Notice of Non-Compliance to the Applicant for permitting the <br /> discharge of drainage into the Mashpee River. Evidence was received that <br /> the Building Inspector had issued a Stop Work Order on the construction of <br /> the house as it did not comply with the original plans submitted and the <br /> septic system was not placed on the area shown on the plan. <br /> Evidence was received during the conduct of the hearings from the <br /> Mashpee Conservation Commission, the Herring Warden, D.E.Q.E. and from <br /> numerous other sources that substantial degrading of the Mashpee River <br /> was currently taking place at the site•of. Lots 14 & 15 and that ,the plan <br /> as presented by Mr. Sullivan would exacerbate this process of siltation of <br /> P <br /> the River which would have a serious impact on the continuing' life�of the . ' <br /> River as a fish run for alewives and brook trout. The evidence further <br /> indicated that the variance request in its present form 'could not be <br /> granted without constituting a detriment to the area and without substan- <br /> tial derogation from the intent and purpose of Section 11A of the Zoning <br /> by-Law. The evidence further indicated a lack of substantial hardship. <br />
The URL can be used to link to this page
Your browser does not support the video tag.