Laserfiche WebLink
January 2000 <br /> Page 2. <br /> Mr. Sherman had no problems with the proposal. There is an engineered <br /> plan on the wall. It was noted there is the mandatory drywell for the <br /> swimming poo . <br /> Public comment: none. } <br /> VOTE: Motion made and seconded to close pending DEP number. <br /> Unanimous vote. <br /> . - I <br /> CLOSED PENDING. <br /> - I <br /> 7:10 COLONIAL GAS COMPANY for a Determination of Applicability o <br /> the installation of a 2" natural gas main within shields Lane, Santuit Lane, <br /> and installation of service to 12, 34, 35, 43 and 138 s ntuit Dane. Tom <br /> Kelley was present. Installation will be by plover method. <br /> Ms Boretos recommended approval. <br /> Public comment: none. <br /> VOTE: Motion made and seconded to find negative. Unanimous vote. <br /> NEGATIVE DETERMINATION. <br /> 7:15 DEAN P. PASKOS for a Determination of Applicability on a request to <br /> permit the after-the-fact installation of a leaching pit to replace a failed pit at <br /> 15 sextant Circle. <br /> Mr. Sherman advised they did not enclose a plan with the filing. Under the <br /> original order of Conditions an area was to be left natural. There was <br /> cutting done and a cecl put in. He suggested sending an Enforcement order, <br /> If the take care of all the problems, it could be accepted as ars RDA. <br /> Public comment. none. <br /> VOTE: Motion made and seconded to continue the hearing to 3 February <br /> 2000 at 7:30 p.m. with a letter to be sent that they have ten days <br /> to agree to the continuance or the Commission will find positive. <br /> Unanimous vote. <br /> HEARING CONTINUED, <br />