Laserfiche WebLink
the property that is clearly disturbed landscape with a walkway. They will provide a narrow buffer <br /> with mitigation plantings. They will be meeting a little more than the mitigation requirements with <br /> additional plantings. The total mitigation area is approximately 235 sq. ft. Agent McManus confirms <br /> that the area is heavily disturbed with a stone wall. There is no impact to the resource area. Mr. <br /> Sweet asks if it will be on concrete and Mr. Vaccaro says that it will be on sonotubes. <br /> Motion made, seconded and unanimously carried to Close and Issue <br /> 7:15 William Sullivan SE 43-2643 (180 Daniels Island Rd) Construct detached structure and stone <br /> retaining wall with masonry steps– NOI <br /> Resource Area: LSCSF, Buffer Zone to Salt Marsh <br /> Material submitted., Proposed BarnlGyrnlBoat Storage 01/13111 Cape & Islands Engineering <br /> Stone Wall Detail 1121111 Cape & Islands Engineering <br /> Jack Vaccaro from Vaccaro Environmental is representing the applicant and states that last spring <br /> this residence had been presented for a project that included several additions including a detached <br /> building that had been much closer to the wetland than what is being proposed now. At that time, it <br /> was agreed to withdraw the detached barn/gym/boat storage building from the plan which allowed <br /> the Commission to issue a permit for the additions. This project shows a new proposed design for <br /> a smaller structure, basically in the same area but back and further away by reducing the building <br /> footprint and sliding it back closure towards the front of the lot. This combination allows them to <br /> move the structure outside of the 50' buffer from the wetland. There are also some hardscaped <br /> improvements proposed that serve as linkage to provide a level surface between the existing <br /> residence and the proposed detached structure. There are two drywells for roof runoff and <br /> extensive mitigation to offset the increase in hardscaped. Agent McManus reads the BOH <br /> comments for the record which state that there is to be no heat permitted for the barn/gym/ <br /> boathouse. Mr. Vaccaro states that he is puzzled by this comment as this is not a seasonal home <br /> and they plan to use the gym during the winter. The Agent mentions that it is not based on an <br /> environmental decision but on the capacity of the septic system so Mr. Vaccaro will have to speak <br /> with the Board of Health. The Agent states that this project meets the performance standards and <br /> there is no impact to the resource area. The agent also noted that the orders of conditions for this <br /> project will not be issued until matters are resolved with the Board of Health <br /> Motion made, seconded and unanimously carried to Close and Issue <br /> 7:18 Leslie Caffyn (10 Popponesset Island Road) Install underground utilities – RDA <br /> Resource Area: Buffer Zone to Coastal Bankl Salt Marsh <br /> Material submitted: Proposed Sewage Disposal 1120111 Cape & Islands Engineering <br /> John Slavinski from Cape & Islands Engineering is requesting to install a septic system that has <br /> previously been approved but they need to extend the pipe. Agent McManus states that he met <br /> with the contractor on-site to go over the layout and it was mentioned that there was no way around <br /> it and they will have to relocate the pipe. There will have to be a few trees removed but the owner <br /> is willing to provide new plantings. The Agent recommends leaving the pitch pine stumps and not <br /> to ground them. <br /> Motion made, seconded and unanimously carried for a Negative Determination <br /> 7:21 New Seabury Golf Club SE 43-2647(0-Off Seanest Drive) Relocate Ocean Course 2 nd Tee <br /> Boxes 1 & 2 and Cart Path – NOI <br /> Resource Area: LSCSF, Buffir—Zone to Coastal Bank& B VW& Wetland <br /> Material submitted: Plan of Ocean Course 2" Tee Boxes & Cart Path Relocation 1/13/11 BSS <br /> Design <br /> 4 <br />