My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/10/1997 FIRE STATION BUILDING COMMITTEE Minutes
>
12/10/1997 FIRE STATION BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2018 1:57:42 PM
Creation date
4/27/2018 1:57:31 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
FIRE STATION BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
12/10/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ro"';.oF <br /> ToWn of ,tea obpee <br /> •.. � ; 16 GREAT NECK ROAD NORTH <br /> 9.., <br /> rR`.... •"�'�� MASHPEE, MA 02649 <br /> �A91E� <br /> FIRE STATION BUILDING COMMITTEE <br /> TO: GEORGE COSTA, Chairman <br /> Board of Selectmen <br /> FROM: JIM VACCARO, Chairman, Fire Station Building Committee <br /> SUBJ: CONTRACT with DONHAM & SWEENEY <br /> ESTIMATED PROJECT COSTS <br /> TOWN MEETING ARTICLE &BALLOT QUESTION <br /> CONTRACT with DONHAM & SWEENEY: <br /> The Fire Station Building Committee is submitting a contract with Donham & <br /> Sweeney for Board of Selectmen approval and execution. This contract provides <br /> for schematic design, design development, preparation of contract documents and <br /> bidding and construction administration for the Fire Station and for a feasibility <br /> study and conceptual design for the South Mashpee Substation. The total contract <br /> cost for these architectural, design and engineering services is $172,470. In event <br /> the project is not funded, the contract limits the Town's financial liability to <br /> $120,000. This document has been reviewed by Town Counsel and modifications <br /> recommended by Town Counsel have been incorporated. <br /> ESTIMATED PROJECT COSTS: <br /> The project will be designed to conform with BOS guidelines for a budget of$1.7 <br /> million for construction and furnishings, fixtures and equipment (exclusive of <br /> apparatus). Additional non-construction costs include: <br /> Architectural design and engineering and <br /> bidding and construction administration (as <br /> described above) $ 172,470 <br /> Clerk of the Works $ 50,000 <br /> Printing for bidding $ 12,000 <br /> Testing and re-imbursements $ 13,000 <br /> Site engineering $ 4,000 <br /> Administration and design contingencies $ 6,000 <br /> TOTAL NON-CONSTRUCTION COSTS $ 257,470 <br /> When the $127,500 now available is applied to this budget, the estimated amount <br /> to be requested for appropriation is $1,830,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.