My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/4/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
8/4/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:01:52 PM
Creation date
5/9/2018 2:28:26 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/04/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mashpee Fire - <br /> PCO/Change Order Loq Throuqh 7/31/08 <br /> P #11 DESCRrPTrn, Issue <br /> Date Reason For Change <br /> Ori final Value Final Value Change Class <br /> e Modify the emerge n cy generator pad size from xg to x13. . 5!14/08 Necessary to accommodate the approved generator. Size <br /> shown on drawings was genericbut not lame enou h. $400.00 $400.00 Design <br /> Increase admin able end stud from 2x4 to 2x6 5/14108 Necessaryto accommodate the insulation application. 40.OU 4�.0� Derr r�1�1 rade <br /> 'g Add on 3/4"plywood cap to the chimney cap. 5114/08 PA recommended this change as a proactive waterproofing <br /> Modify the flashing interface detail between the exterior slabs at measure. $40.00 Design/Upgrade <br /> h 5/14108 P recommended this change for proactive reasons and to <br /> rrtrar�o end patio and the arterior floor slab. avoid the transfer of water from ��.�� <br /> the exterior to interior. $300.00 Upgrade <br /> Cost associated with moving 1)apparatus bay unit heater to let Change For C ## - 11130.00 <br /> 11� This r a cosmetic recommendation and will rro#irn rove or <br /> a�roid seeing the exhaust stack in the front elevation. p 0. <br /> effect the o ration of the stern. 1.00 Upgrade <br /> Net Change For C $920.60 <br /> g Cost associated with adding(1 "bollard to protect HVAC. 7/23/08 Proactive change to prevent appartus from backinginto the <br /> 7 <br /> ad mounted HVAC unit at the rear of the building. 17, <br /> 1 Credit for the elimination of urbrr� HT1 .�0 Upgrade <br /> X123108 Proactivechary a for draina a and snow iowrn rr�ea ure . - . <br /> E11 Credit for the elimination of the donne tic warter bac#flo -$87.00 Upgrade <br /> reventer. 7123108 F eccomendation by the Mashpee Water Deportment -$1,117.00 -$1,117,00: Value <br /> Engineering <br /> Net Change For C #4 4467.00 <br /> Current Net Change Of CO's 1 3&4. 14,561.60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.