8/4/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
>
8/4/2008 PLANNING AND CONSTRUCTION COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 5:01:52 PM
Creation date
5/9/2018 2:28:26 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
PLANNING AND CONSTRUCTION COMMITTEE
Meeting Document Type
Minutes
Meeting Date
08/04/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mash Fire - PCO/Change Order Log - Through 7131/08 <br /> PCS DESCRIPTION Issue Reason For Change Change Class <br /> Date Ori final Value JEFInal Vafue <br /> The first door entering the Lobby has keyless entry.The <br /> 1 Add ition of keyless entryhardware at interior door of Lobby. 3125103 second door going from the Lobby to the interior of the building $1,297.00 $1,297.00 Design This a�dc <br /> is not currently equipped with keyless entry and it should be in 9 <br /> order for the system to work. <br /> Addition of remote transmitters and receivers for each overhead /25/0This system addition will allow the drivers to open and close .00 $96 .00 design This co <br /> door. the VHD doors from the cabs of the units. <br /> This conduit is required to service the additional call box which The a` <br /> Add an additional conduit from the electrical room to the exterior GB has requested be roughed in at this location.The call box been re <br /> 3 door of the Adrenin Entrance. 3128108 would be used in the event of an emergency and someone $802.00 $802.00 Upgrade this woi <br /> goes to the facility and it is not open at the time. process <br /> The Curr <br /> The re-design would include a )sided galvanized angle box <br /> frame which would frame the recess.The recess would be dra'r <br /> Re-design of the slab at the overhead doors to accommodate a exterior of the overhead door a n(1 wnii1H M'GIV-�l recommi <br /> 112„elevation difference between the exterior concrete apron 3131108 .- '*�*4 J p wind driven $2,174.00 $2,174.00 Upgrade There ar <br /> and the interior apparatus bay slab. rain from entering the building from under the door. BCC made a prob <br /> this suggestion as they have employed this detail on other <br /> projects and reportedly works very well. applicat <br /> _ lineal foc <br /> a <br /> Net Change For C0#1 $x,238.00 <br /> Eliminate the stamped concrete pad finish at the exterior patio 12g10S Value engineering action. , 0.00 -$ Value <br /> and rovide a standard broom finish. Engineering <br /> Eliminate several electrical conduits which were not necessary 413010$ Value engineering action which resulted from the on site -$280.00 -$250.00 Value <br /> for the system. coordination meeting. Engineering <br /> The <br /> The team is concerned with the continuity of the vapor barrier applicat <br /> 7a Upgrade the attic insulation of the administration wing from Sat# 5114108 when using the Batt type of installation.Breaches in the vapor $3,100.00 $3,000.00 Upgrade insulatic <br /> type to spray foam. barrier could result in,moisture and mold issues in the future. Value <br /> The spray foam application eliminates the concern. desi( <br /> analyzed <br /> Thp r-_nntrnr_tnr Ione.fpmmmPnripri thi,chanop-hA_ngtjgP of the <br /> The coat <br />