My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2012 SEWER COMMISSION Minutes
>
11/15/2012 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 11:56:55 AM
Creation date
1/2/2019 1:38:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/15/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SANDWICH <br /> d L= <br /> BOURNE <br /> og <br /> I <br /> t gg <br /> / BARNSTABLE <br /> ,r <br /> FALMOUTH <br /> a 65 L I <br /> t r I,Ii <br /> e r <br /> L<fleRE J 9-.Pl thoA ac <br /> �. . on <br /> Figure 4. Option 1B Scenarios. <br /> 87%of the total study area wastewater flow(2.3 MGD)is treated to 3 mg/L TN and discharged at 11 sites <br /> within the estuary watersheds; 12% (0.32 MGD).of study area flow remains on standard septic systems. <br /> Portions of the Falmouth and Barnstable sections of the study area are discharged outside of the <br /> watersheds, while the Sandwich portion (0.37 MGD) is treated to 3 mg/L and is discharged within the <br /> Peters Pond subwatershed. Modified from Figure 3 in GHD 2/15/12 memo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.