My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2012 SEWER COMMISSION Minutes
>
11/15/2012 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2020 11:56:55 AM
Creation date
1/2/2019 1:38:55 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
11/15/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i; SANDWICH <br /> 5 1 <br /> ,t> <br /> KOW <br /> BOURNE <br /> i N <br /> g( w <br /> 1 <br /> (� r <br /> ' F } �' s <br /> BARNSTABLE <br /> a <br /> l <br /> Lr� <br /> FALMOUTH <br /> 77 <br /> ff l Rti <br /> ,l ✓*� J�3 - 1 <br /> ts4en4 sewer asenna,a areas <br /> Figure 5. Option 1 C Scenarios. <br /> 74% of the total study area wastewater flow (2.0 MGD) is treated and discharged at 10 sites within the <br /> estuary watersheds: 18%(0.48 MGD)remains on standard septic systems, 1%utilize cluster denitrifying <br /> septic systems @ 19 mg/L TN, and the remainder of flows are treated to 3 mg/L TN and are discharged at <br /> ten (10) sites within the estuary watersheds. The majority of the treated effluent from Falmouth, <br /> Sandwich, and Barnstable sections of the study area is discharged outside of the watersheds (see orange, <br /> yellow, and green arrows, respectively). Site discharges to multiple discharge sites (i.e., Keeter, Pirates <br /> Cove, Willowbend, and Back Roads) are assigned on the same basis as in Option 113. Modified from <br /> Figure 4 in GHD 2/15/12 memo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.