My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/17/2013 SEWER COMMISSION Minutes
>
1/17/2013 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 2:18:23 PM
Creation date
1/2/2019 1:40:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�_.f` saroowrcx <br /> BOURNE <br /> t r r <br /> BARNSiABtE <br /> lr— <br /> �t7t7- <br /> F.44W, <br /> l Jc_ <br /> ry1i7 yi <br /> Figure 4. Option 113 Scenarios. <br /> 87%of the total study area wastewater flow(2.3 MGD)is treated to 3 mg1L TN and discharged at 11 sites <br /> within the estuary watersheds;12%(0.32 MGD)of study area flow remains on standard septic systems. <br /> Portions of the Falmouth and Barnstable sections of the study area are discharged outside of the <br /> watersheds,while the Sandwich portion(0.37 MGD)is treated to 3 mglL and is discharged within the <br /> Peters Pond subwatershed.Modified from Figure 3 in GHD 2115/12 memo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.