My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/17/2013 SEWER COMMISSION Minutes
>
1/17/2013 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2020 2:18:23 PM
Creation date
1/2/2019 1:40:14 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
01/17/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�! ; . SANFWIGN <br /> BOURNE <br /> tt G R <br /> BARN9TABLP <br /> 17 ggq <br /> Figure 5. Option 1C Scenarios. <br /> 74%of the total study area wastewater flow(2.0 MGD)is treated and discharged at 10 sites within the <br /> estuary watersheds: 18%(0.48 MGD)remains on standard septic systems,1%utilize cluster denitrifying <br /> septic systems @ 14 mglL TN,and the remainder of flows are treated to 3 mglL TN and are discharged at <br /> ten (10) sites within the estuary watersheds. The majority of the treated effluent from Falmouth, <br /> Sandwich,and Barnstable sections of the study area is discharged outside of the watersheds(see orange, <br /> yellow,and green arrows,respectively).Site discharges to multiple discharge sites(i.e.,Keeter,Pirates <br /> Cove,Willowbend,and Back Roads)are assigned on the same basis as in Option 1B. Modified from <br /> Figure 4 in GHD 2/15/12 memo. <br />
The URL can be used to link to this page
Your browser does not support the video tag.