My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/15/2011 SEWER COMMISSION Minutes
>
3/15/2011 SEWER COMMISSION Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2020 11:17:00 AM
Creation date
1/2/2019 1:50:05 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
SEWER COMMISSION
Meeting Document Type
Minutes
Meeting Date
03/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRELIMINARY PRESSURE SEWER - SIZING AND BRANCH ANALYSIS <br /> Prepared By: TRANSFER STATION COLLECTION AREA <br /> March ]4,2011 <br /> FRMA --- <br /> - - <br /> - -- <br /> - - --- Accum Fnc Alai Main lininnnn Pum Static Head Total <br /> Zone Connects iNuniber ;.Accum Gals/day Max Plow tvhx i\9ax Flow' Pipe Size Max Length of' LossFrtction �' i . <br /> Number to 7_one oFPumps'Pumps per Pump 'Per Pump Sim Ops(GPM) (inches) elocity, this Zone actor Loos eThis Loss(feet) Elwation I Elevation (feet) Dynami) <br /> m Zone in Zone (Qpm) (FPS) !tUIooft) k _ ead(ft <br /> _ --�----�=- -� - - --- 1-- ----l -�- - ----i-- ---- <br /> _�------- Friction loss calculions were based on a Constant for inside roughnes�'C"of: 150 <br /> This spreadsheet was calculated using pipe diameters far SDR11 HDPE -- -- <br /> 141.00 142.00 17 29 200 11.0_0 S l- 55.00 3.00 2.74�1,100.00 0.98 10.81 33.15 70.00 __ 44.001 26.00 _5_9,15_ <br /> 142.00 144.00 24 53 200 11.00 7 77.00 4.00 2.32 1,500.00 0.54 8.09 22.34 70.00 46.00 24.00 46.34 <br /> 142.-0 144. 00 8 8 200 11.00 3 33.00 2.00 3.57 550.00 2.52 13.86 28.11 70.00 42.00 __ 28.00 - 56.11 <br /> 144.00 107.00 9 70 200 11.00 7 77.00 4.00 2.32 650.00 0.54 3.51 14.25 70.00 _39.00 _ 31.00 45.25 <br /> Page 5 Note: This analysis is valid only with the use of progressive cavity type grinder pumps as manufactured by Environment One. <br /> F:\Frma\Projects\Eone Projects\Massachusetts\Mashpee\Mashpee Sewer Plan\Transfer Station.Eone <br />
The URL can be used to link to this page
Your browser does not support the video tag.