Laserfiche WebLink
CEP--27--1996 08:39 FROM STREKALOVSKY & HO I T 9 INC. TO 15085391403 P-02 <br /> CHANGE ORDER <br /> AIA Document 0701 Owner C] <br /> Architect <br /> Contractor 0 <br /> Field <br /> Other Q <br /> PROJECT: Additions and Renovations CHANGE ORDER NUMBER; 5 <br /> (name,address) Mash pee Town Hall <br /> DATE: September 25, 1996 <br /> To CONTRACTOR: D`Agostino Associates, Inc. ARCHI I EC I S PROJECT NO. 95064 <br /> (name,address) 46 Farwell Street <br /> NewtonT MA 02160 CONTRACT DATE: may 10, 1996 <br /> CONTRACT FOR: Construction <br /> THE CONTRACT Is CHANGED AS FOLLOWS: <br /> Item#1 Correct floor framing 1st floor, concealed condition $ + 19500 <br /> Item#2 Install additional steel crawl space, support record storage +3,500 <br /> Item#3 install additional steel, folding partitions +21500 <br /> Item#4 Remove parapet wall, request of Bldg. Dept. + 1,600 <br /> Item#5 Install 8" main for sprinkler service +311200 <br /> Item#6 Remove concrete areaway, front,concealed condition + 1,200 <br /> Item#7 Remove concrete areaway, rear, concealed condition + 1,800 <br /> Item#3 Instalt electric service, 2nd floor finish +3,700 <br /> Item#9 Install new root surface, original building + 16,000 <br /> Item#10 Install fire spinkler system (mains, branches, no heads) +29,000 <br /> Item#11 Deduct-installation of hydraulic lift credit (10,000) <br /> Item#12 Deduct•South stairhall extension to 2nd floor Credit (25,000) <br /> Item#13 Deduct- removal of underground storage tank Credit 6,500) <br /> Total Change Order $ 21 two <br /> ---- - wwnww.nw�rrr�rr rwrrr,�rrr <br /> Not valid until signed by the Owner,Arrritect and Contractor. <br /> The original Contract Sum was: $ 11485:900.00 <br /> Not change by previously authorized Change orders $ 97,970.00 <br /> The Contract Sum prior to this Change Order was $ 1,584,870.00 <br /> The Contract Sure will be increased by this Change Order in the amount of $ 21,500.00 <br /> The new Contract Sunt including this Change Order will be $ 1,606r 370,00 <br /> The Contract Time will be unchanged <br /> The date of Substantial Completion as of the date of this Change Order therefore Is Feb. 1, 1997 <br /> We: This summary does not mflect changes In the Contract Sum, Contract Time or Guaranteed Maxir"urn lance which have been <br /> authorized by Construction CharW DireCVve <br /> Town of[Inas h pe e <br /> Strekalovsky & Hoit, Inc. ❑`Agostino Associates, Inc. Board of Selectmen <br /> AmhiWt Corr fivr Owner <br /> 51 North Street 45 Farwell Street 16 Great Neck Road North <br /> Addre" Address Address <br /> Hingham, IIIA 02043 Newton, MA 02150 Mashp'ee. MA 02649 <br /> By: By-, BY: <br /> Dale: Date: Date= <br /> Y r�TA1 1"1 t7^1 <br />