Laserfiche WebLink
retention ponds or any other development involving clearance of natural vegetation be permitted within said area. <br /> Nothing herein is intended to prohibit appropriate tree surgery or similar maintenance of vegetation in this buffer <br /> area.16 <br /> z. . <br /> Any water or wetland,as defined under MGL C.131, §40,any existing or proposed street or any roadway,right <br /> of Way`or easement twenty (20) feet or more in:width may not be counted toward lot size for the purpose of : <br /> calcuIating maximum lot coverage.For lots in any cluster subdivision,maximum lot coverage shall be thirty(30) <br /> percent. For single-family residential lots not in a cluster subdivision,but having ten thousand(10, 00')square <br /> feet or less of lot size,maximum lot coverage shall be twenty five(25%)percent. ,. <br /> Mstory: Added 10-7-1991 ATM Article 24approved by Attorney General 2-3-1992. <br /> EDAM Amended 10,7-1996,ATM Article 28 approved by Attorney General 12-9-1996 <br /> Mstory,-Amended 10-16-2017 ATM,Article 28 apwroyed by Attorney General 2.21-2018 a:. <br /> n Except as otherwise allowed under§174-46,Open space incentive development <br /> History: Added 10-74491 ASI(,Article 24,approved by Attox ney General on 2.3-1992 _ <br /> 1s Maximum height within the Popponesset Overly District shall be thirty(30) feet, subject to the provisions of <br /> Footnote 4 of this table. Minimum lot size shall-be six thousand(6000') square feet,minimum frontage.sixty .• <br /> (60')feet,minimum building setbacks 25 feet front, 15 feet rear and 15 feet side and maximum of lot coverage <br /> twenty five(25%)percent: <br /> Mitory:Added 5.3-1993-ATM,Article 12,approved by Attorney General 7-19-1993 <br /> u.: <br /> History: Amended 5-6-1997;ATM Article 46 approved by Attorney General 9.25-1997 <br /> History: Amended 10.16=2017 ATM Article 18 approved by Attorney General oro 2-21.2018. '•'x:` <br /> is These setback requirements shall not apply to the following building projections provided they do not exceed the { <br /> sizes specified, as measured from the foundation line along a line perpendicular to the nearest property line: <br /> chimney projectin no more than three 3 feet, house overhang g" (' ) g projectaig no more than two (2) feet, roof <br /> overhang projecting no more than-three and one-half(3 1/2)feet, and open decks or platform's used for egress <br /> projecting no more than four(4) feet. These setback requirements shall*also not apply t6 stairs required as a <br /> means of egress,'basement bulkhead'ofthe hatch door type or handicapped access ramps on private property used :{ <br /> solely for the purpose.of facilitating ingress or egress of a physically bandicapped person,as defined in MGL C. <br /> 22, §13A. <br /> History, Added 10.4.1993 ATM,Article 26,approved by Attorney Gel raI 10-18-1993. <br /> 20 Minimum front building setback within the Mashpee Overlay District shall be twenty(20)feet and maximum <br /> allowed building setback for the principal structure on a lot shall be forty(40)feet. :t <br /> Except as required by§174-25.1.. <br /> Mstory: Added 10-4-1999 ATM,Article 29,approved by Attonyey General 1.11-2000. <br /> History: Ameaded 10-7-2002 ATM,Article 22,approved by Attorney General 11-27-2002. <br /> 1: <br /> Except that hotels and motels(and not other uses)approved by the Planning Board under the provisions of§174- <br /> 45 <br /> 17445 maybe increased to three(3)stories and forty five(45)feet,if approved by the Board,provided that there is <br /> •adequate access for Fire Department vehicles.and equipment and that all Fire Protection Construction Documents <br /> required by 780 CMR Subsection 903.1.1 of the Massachusetts State Building Code,have been submitted to the <br /> Planning Board and Fire Department as part of the Special Permit application and the Board is satisfied that the u. <br /> standards of said Subsection will be met; 4 <br /> Eastory: Amended 10-18-2004'ATM,Article 40,Approved byAttorney General 12-16-2004, ,. :. <br /> .r.� <br /> 2z Minimum front building setback within the Mashpee Center Overlay District shall be twenty (20) feet and :f: <br /> maximum allowed building setback for the principal structure on a lot shall be forty(40)feet: <br /> History-, Added 10-17-2005 ATM,Article 18,approved by Attorney Genera13-7-2006. <br /> 23 Minimum required setback from*rear or side property lines shall be`five (5) feet for sheds or similarly non- <br /> inhabitable structures not exceeding 120 square feet in floor area or twelve(12)feet in height. <br /> History: Added 10-17-200S ATK Arficle 13,approved by Attorney General-3=7 2006. . <br /> 24 Except tllathotels,and motels maybe four(4)stories and fifty(50')feetif approved by Planning Board as part of <br /> a Special Permit for a project and that said building shall be,consistent with the Cape Cod Commission design F. <br /> guidelines entitled,"Contextual Design on Cape Cod".dated•October 1,2009, <br /> Sistory Added 1016-2017 ATM Article 16,approved by Attorney General 2 <br /> 59 G': <br />