|
retention ponds or any other development involving clearance of natural vegetation be permitted within said area.
<br /> Nothing herein is intended to prohibit appropriate tree surgery or similar maintenance of vegetation in this buffer
<br /> area.16
<br /> z. .
<br /> Any water or wetland,as defined under MGL C.131, §40,any existing or proposed street or any roadway,right
<br /> of Way`or easement twenty (20) feet or more in:width may not be counted toward lot size for the purpose of :
<br /> calcuIating maximum lot coverage.For lots in any cluster subdivision,maximum lot coverage shall be thirty(30)
<br /> percent. For single-family residential lots not in a cluster subdivision,but having ten thousand(10, 00')square
<br /> feet or less of lot size,maximum lot coverage shall be twenty five(25%)percent. ,.
<br /> Mstory: Added 10-7-1991 ATM Article 24approved by Attorney General 2-3-1992.
<br /> EDAM Amended 10,7-1996,ATM Article 28 approved by Attorney General 12-9-1996
<br /> Mstory,-Amended 10-16-2017 ATM,Article 28 apwroyed by Attorney General 2.21-2018 a:.
<br /> n Except as otherwise allowed under§174-46,Open space incentive development
<br /> History: Added 10-74491 ASI(,Article 24,approved by Attox ney General on 2.3-1992 _
<br /> 1s Maximum height within the Popponesset Overly District shall be thirty(30) feet, subject to the provisions of
<br /> Footnote 4 of this table. Minimum lot size shall-be six thousand(6000') square feet,minimum frontage.sixty .•
<br /> (60')feet,minimum building setbacks 25 feet front, 15 feet rear and 15 feet side and maximum of lot coverage
<br /> twenty five(25%)percent:
<br /> Mitory:Added 5.3-1993-ATM,Article 12,approved by Attorney General 7-19-1993
<br /> u.:
<br /> History: Amended 5-6-1997;ATM Article 46 approved by Attorney General 9.25-1997
<br /> History: Amended 10.16=2017 ATM Article 18 approved by Attorney General oro 2-21.2018. '•'x:`
<br /> is These setback requirements shall not apply to the following building projections provided they do not exceed the {
<br /> sizes specified, as measured from the foundation line along a line perpendicular to the nearest property line:
<br /> chimney projectin no more than three 3 feet, house overhang g" (' ) g projectaig no more than two (2) feet, roof
<br /> overhang projecting no more than-three and one-half(3 1/2)feet, and open decks or platform's used for egress
<br /> projecting no more than four(4) feet. These setback requirements shall*also not apply t6 stairs required as a
<br /> means of egress,'basement bulkhead'ofthe hatch door type or handicapped access ramps on private property used :{
<br /> solely for the purpose.of facilitating ingress or egress of a physically bandicapped person,as defined in MGL C.
<br /> 22, §13A.
<br /> History, Added 10.4.1993 ATM,Article 26,approved by Attorney Gel raI 10-18-1993.
<br /> 20 Minimum front building setback within the Mashpee Overlay District shall be twenty(20)feet and maximum
<br /> allowed building setback for the principal structure on a lot shall be forty(40)feet. :t
<br /> Except as required by§174-25.1..
<br /> Mstory: Added 10-4-1999 ATM,Article 29,approved by Attonyey General 1.11-2000.
<br /> History: Ameaded 10-7-2002 ATM,Article 22,approved by Attorney General 11-27-2002.
<br /> 1:
<br /> Except that hotels and motels(and not other uses)approved by the Planning Board under the provisions of§174-
<br /> 45
<br /> 17445 maybe increased to three(3)stories and forty five(45)feet,if approved by the Board,provided that there is
<br /> •adequate access for Fire Department vehicles.and equipment and that all Fire Protection Construction Documents
<br /> required by 780 CMR Subsection 903.1.1 of the Massachusetts State Building Code,have been submitted to the
<br /> Planning Board and Fire Department as part of the Special Permit application and the Board is satisfied that the u.
<br /> standards of said Subsection will be met; 4
<br /> Eastory: Amended 10-18-2004'ATM,Article 40,Approved byAttorney General 12-16-2004, ,. :.
<br /> .r.�
<br /> 2z Minimum front building setback within the Mashpee Center Overlay District shall be twenty (20) feet and :f:
<br /> maximum allowed building setback for the principal structure on a lot shall be forty(40)feet:
<br /> History-, Added 10-17-2005 ATM,Article 18,approved by Attorney Genera13-7-2006.
<br /> 23 Minimum required setback from*rear or side property lines shall be`five (5) feet for sheds or similarly non-
<br /> inhabitable structures not exceeding 120 square feet in floor area or twelve(12)feet in height.
<br /> History: Added 10-17-200S ATK Arficle 13,approved by Attorney General-3=7 2006. .
<br /> 24 Except tllathotels,and motels maybe four(4)stories and fifty(50')feetif approved by Planning Board as part of
<br /> a Special Permit for a project and that said building shall be,consistent with the Cape Cod Commission design F.
<br /> guidelines entitled,"Contextual Design on Cape Cod".dated•October 1,2009,
<br /> Sistory Added 1016-2017 ATM Article 16,approved by Attorney General 2
<br /> 59 G':
<br />
|