Laserfiche WebLink
MASHPEE ZONING BOARD OF APPEALS <br /> DECISION FOR A WRITTEN FINDING <br /> John Henry and Constance M. Henry <br /> 21 Kim Path(Map 117 Parcel 265) <br /> Mashpee, MA 02649 <br /> FINDING-2019-09 <br /> In view of the foregoing, the Board determined the Petitioner met the criteria for a <br /> Written Finding. Upon motion duly made and seconded at the Public Hearings on <br /> Wednesday, January 23, 2019,the Zoning Board of Appeals voted unanimously to issue a <br /> Written Finding to John and Constance Henry, at 21 Kim Path, Mashpee, MA with the <br /> following conditions; <br /> 1. The Board has determined that the applicant meets all the conditions of a Written <br /> Finding under Mass General Law 40A Section 6. <br /> 2. Proposed Septic System Upgrade Plan—21 Kim Path, Mashpee, MA. Prepared <br /> for: Brian Smith,42 Greendale Ave.,Needham, MA. Engineering by: Engineering <br /> Works, Inc., Scale 1" = 20', Drawn by: PTM, Job No.: 124-15, Date: 4/22/15, <br /> Checked by: PTM, Sheet No. 1 of 3, Signed by: Peter T. McEntee, Registered <br /> Professional Engineer,No.: 35109. <br /> 3. Proiect Description: Sun Deck, Renovations for: John & Constance Henry, 21 <br /> Kim Path, Mashpee, MA. Prepared by: Clancy & Castano, LLC, PO Box 249, S. <br /> Dennis, MA, 508-240-4404, Date: 11/5/2018, Scale: 1" = 20', Sheet A-1 Rear <br /> Elevation, Left Side Elevation, and Right Side Elevation, Sheet A-2: Right Side <br /> Elevation (Proposed), Rear Elevation (Proposed), Left Side Elevation (Proposed), <br /> Sheet A-4: Deck Construction Guide. <br /> 4. Conditioned on all Town Department comments read into the record. <br /> 5. Referencing the site plan that Mark Clancy added lot coverage as of today's date <br /> is currently 9.32% and proposed is 12.16. <br /> 2 <br />