My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/4/1997 TOWN HALL BUILDING COMMITTEE Minutes
>
6/4/1997 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:00:52 PM
Creation date
4/24/2019 11:12:53 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/04/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• -04-1 11:58 TF 'r .O 'KY I T 1 1 '740 4279 P.02/06 <br /> STREKALOVSKY & HOIT, INC. A. 1. A. ARCHITECTS <br /> 51 NORTH STREET, HINGHAM, MA 02043 1 7494160 FAX 1 740-4279 <br /> May 30, 1997 <br /> Iver. Willem Hauck <br /> pector of Buildings <br /> 16 Great Neck Road North <br /> Mahpee, MA 02649 <br /> Dear Mr. Haack: <br /> We am writing in response to your letter dated April 7, 1997 D*Agostino Associates' <br /> letter dated April 2 1, 1997 coy cer=- g code violations at the Ilr shpee Toixm Hall project. <br /> 1# Door L-20 Q.UnumFlocr <br /> D'Agostino will provide a smooth tra ition between the mechanical room and boiler <br /> room at door -20 where the existing floors are at different elcvations prior to June 9, <br /> 15970' <br /> - <br /> 2. �h=ical &&U:% .enc='om-RZilir Lzaks <br /> D Agostino will seal all pipe Penetradons and repair leas as a part of the punch list <br /> work which will be completed by June 9, 1997. <br /> . MeehUj&g1 Roorn -Air Adie mo o , <br /> D'Agostino will replace the existing 2k 4 plate set on the concrete floor with a 2 <br /> press treated rneabcr prior to June 9, 1997. <br /> y # f� -PUM12 Zoom iCYTIt . <br /> D'Agostino will provide a cost proposal for stalling a light fixture in the Pump <br /> room to replace the.temporary fixture. <br /> 5. S tair#1 -Pum2 R Q o rn Doo E T4ardwar; <br /> 'Agostino will provide a cost proposal for i�Uing a door knob with Knurled <br /> s ,r a a on the pump room door. <br /> . F.Jecidol-Panel Cove= <br /> D'Agostino replacement electrician has installed panel covers and blank plates in the <br /> new electric panels. <br /> 7. Megbanicill FQU' <br /> IpMeat - Desimand Bglance <br /> D'Agostmo and HVAC subcontractor have checked systems, balanced air quantities <br /> and the HVAC systems are operating as specified. A two pipe system provides <br /> eri iiatiou and heating or cooling 'in the season cycle, <br />
The URL can be used to link to this page
Your browser does not support the video tag.