My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/4/1997 TOWN HALL BUILDING COMMITTEE Minutes
>
6/4/1997 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:00:52 PM
Creation date
4/24/2019 11:12:53 AM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
06/04/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 <br /> ` . �- '-199 7 11* J E1 LO 1��I T _ ��� � � �. � <br /> Mr. William Maack <br /> May 30, 1997 <br /> Page <br /> 8. As-Rnill Dramn 91 QCHer=0nM=aIS <br /> -bunt drawings and operation manuals axe� m �_� by the <br /> design engineers and�I be issued to the <br /> # - of the <br /> wr <br /> _ <br /> contract documentation,estimated June 9, 1997. <br /> 9. &gf ShinvIes=d RxiginZ <br /> The contract documents included insWling now v?i� <br /> replacement of the c=* ting rw f shingles rep s;mem as a <br /> part of an Altercate to the bane bid.. Budget Iii project <br /> eliminated this proposed roof work. The Town of a smbstitule <br /> proposal for insmR ng a new.roof surface over the #� � �the gutters. <br /> This was ars interim measure taken until the foal ,.. - ===I edges and <br /> installation of the new dormer window syst m der the <br /> second phase of the Town Hall-Renova6n ProjecL :. properIV, <br /> documented and addressed Cage Order No. 5v _ <br /> Io. &OLOyra-Execlitima''Sme <br /> This is ars existing roof which was designated to r M <br /> documents. D"A ostino shall provide a cost propessE I Hru wzU sleeper <br /> to relieve any water ponding on the existing roof <br /> 11. ,Thru-WaH Flashijag and We=tea <br /> Thru-wall flashing and weep holes were metalled w--AIJ <br /> constrction. It has been deter-fined that the prv: a ern an <br /> incomplete rood`membrane base flashing install4o:. = #gin fished. <br /> 12.nw T..QQd Irim at Elcyator <br /> The new wood trim and wish work at the elevator z.-� as a part of the ` <br /> work now underway and is expected to be finished = _ <br /> 1 . Numu= <br /> Any'leaks which occur in the new membrane roof c��:,:�#elevator or <br /> access stair or the'1920s sloped roof areas are coves w FF pa=tee. <br /> Any leak s in the origin building addition memo ,r__._ -.ca:vas o ver the <br /> executive secretary or work room areas are not inc* cn project <br /> and roust be corrected at the Town of Mashp=exp 6 to <br /> adjacent to the new gall construction. <br /> 14. Ceiting J:ilr,Missing-in LeiUM.5cryi= <br /> Theceilin tiles have been instaUd in the leisure s,i - o1&L <br /> punch list work which is now being completed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.