Project Representative's Daily Report Page I of 1 <br /> Report No. 41 <br /> Date: 8123196 <br /> Architect: Strekalovsky& Holt, Inc. Darr: Th <br /> Project: Mashpee Town Hall Contractor DAgostino Associates <br /> Superintendent: Leri Paoletta <br /> Weather: 8:00 Ail Partly cloudy Noon: Sun & halve P11,11: Sun &haze <br /> Temperature: 8:00 AM TO Noon: 89 PM: 75 humid <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> rce <br /> Sect. Foreman Journeymen helpers Total <br /> General <br /> Contractor; "Agostino I Job Supt. <br /> Masonry 1 2 <br /> Subcontractors: <br /> JJ Enterprises 7 1 <br /> Eon's Excavating 9 2 3 <br /> TOTAL 1 91 <br /> [Votes: Masonry crew continued to lay up vaultwkwkwa and CMU wall opening between <br /> Sticker office and Main Lobby. The demolition crew is performing clean up on the <br /> east side, first level, south wing. The Job Supt. remarked that he had a carpenter <br /> install a weatherproof structure around the temporary electric power panels. Writer <br /> verified this, enclosure frame is constructed of 2x6"studs with 318"thick C x pWood <br /> sheathing. There are two full width x height 112"#thick plywood Moors wl hinges and <br /> hasp hardware applied. Owner to supply a locking device. Mr. Paoletta remarked <br /> that his carpenter informed Mr. Paoletta that the Bldg Insp. inspected the temporary <br /> structure and said he warted to see the structure waterproofed. The above has been <br /> verbally given to T1s. Jeanine elongchamp of Strekalovsky&Hoit. The excavating <br /> sub-contractor removed the section of existing foundation wall located}ust south <br /> east of the elevator machine room,, lower level. Contractor is in the process of <br /> filling up the recessed floor area, lower level, in "compacted lifts. One mechanic <br /> Wil��I <br /> and one laborer from MEV Mechanical are on site awaiting a delivery of Ri kwell <br /> YI 1■il■ I i 1 I '1'� <br /> piping(underground piping for chiller) <br /> Number Key to Inspection Notes, <br /> 1,Work performed by General Contractor 10. Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator, action <br /> .Work items or extra started talent contrs.seeking compen., item,labor and <br /> 4.Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remarks <br /> . Serious accidents 13. Material and equipment for installation received, <br /> .Visitors and reasons compliance to specs. <br /> B.Testing or inspection 14.Work not meeting specifications <br /> . Equipment on site 15. Items in 14 not corrected. <br /> Copies to: Staff Signed: t <br />