Laserfiche WebLink
Project Representative's Daily Report Page 1 of <br /> Report No. 40 <br /> Date: 8122196 <br /> Architect: Strekalovsky&bolt, Inc. Darr: Th <br /> Project: Mashpee Town Hall Contractor DAgostino Associates <br /> Superintendent: Len Paoletta <br /> Weather: :00 AM Partly sunny Noon- sunny 4PM: Cldy rain <br /> Temperature: :00 AM 72 Noon: 86 4PM-. 76 <br /> PERSONNEL COUNT Spec. Contractor Trade Workforce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: D"Agostino I Job Supt. 1 <br /> Masonry <br /> Subcontractors: <br /> JJ Enterprises 1 1 2 <br /> Ron's Excavating 1 1 2 <br /> TOTAL. 81 <br /> Dotes: Visitors: Security Tech from Assoc. Alarm Systems. PO Box 1148, Hyannis, MA <br /> (508) 747-3399 or 1-800-322-3339. <br /> When asked, the Job Supt. remarked that he was in the process of assembling man- <br /> power and materials for the weatherproof structure over the temp. electric sower <br /> panels. The demolition crew is removing the existing ceiling, wood furring strips, <br /> insulation, and duct work from south wing, first level floor, east side. In addition <br /> to removing the above, it appears as though this crew inadvertently removed the <br /> horn circuit on the existing fire alarm system by allowing debris to drop onto the <br /> wiring and causing same to become overstressed. The strobe lights are also gone. <br /> The security Tech. from Associated Alarm Systems concurs with this last The Job <br /> Supt has been advised. Masonry sub-contractor is working torr the north wing. <br /> ■i1.liPWiIiPPPI_I <br /> Crew is continuing to prep walls and install steel lintels. The counter opening between <br /> the main lobby and sticker office was started today along with the vault walls. <br /> Forays have been stripped from the elevator shaft galls, and same walls have been <br /> coated with bituminous damproofr'ng membrane. Excavator began backfilling <br /> excavation around pit wall in comps cted 8"lift. <br /> Number Key to Inspection Notes, <br /> 1.Work performed by General Contractor 10. Site meeting participants and discussion <br /> .Work performed by subcontractors 11.Variations from plans and specs.,instigator, action <br /> .Work items or extra started taken,contrs. seeking compen.,item,labor and <br /> .Work items or extra completed materials <br /> .Potential or encountered delays 12. Description of job incidents and remarks <br /> .serious accidents 13. Material and equipment for installation received, <br /> .Visitors and masons compliance to specs. <br /> 8.Testing or inspection 14,Work not meeting specifications <br /> g.Equipment on site 15. Items in 14 not corrected. <br /> Copies to: staff Signed: <br />