My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/5/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
9/5/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:07:10 PM
Creation date
4/24/2019 1:32:03 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
09/05/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
■ <br /> Project Representative's Daily Report Page 1 of � <br /> Report No. 39 <br /> Date: 8120196 <br /> Architect: Strekalovsky& Holt., Inc. Darr: T - <br /> Project: Mashpee Town Fall Contractor D'Agostino Associates <br /> Superintendent: Leri Paoletta <br /> Weather: 8:00 Ails Sunny Noon: Pt. sunny PM: Pt. sunny <br /> Temperature: 8:00 AM 68 Noon: 85 4PM: 76 <br /> PERSONNEL COUNT Spec. Contractor Trade Workfbrce <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: D'Agostino I Job sept. <br /> Masonry <br /> Cement Finishers <br /> Subcontractors: <br /> TOTAL 81 <br /> Notes: A job meeting was held on site from 11 am until 11:45am. A cursory tour of work <br /> to mate was made by the party after the meeting. <br /> At 12:10pm a 12 yard delivery of 3000psi concrete was rade from P.A. Landers with <br /> a slump of ". Cement finishers poured the north and east wall of elevator pit and <br /> hoistway Grp to a 10'-0 mark,, while the south wall was poured up to a 4'-0""heigrht. <br /> The vault footing was formed up,, and rerbar was set and tied and this was made <br /> wart of the first pour. <br /> A sweeting with the followings people was held midafternoon to discuss and review <br /> job conditions and progress: <br /> Ms. Jeanine Delon champ- stre aloes y& Holt <br /> Mfr. Len Paoletta-DAgostino <br /> r. John Swenson- stre aloe s y&Holt <br /> Number Key to.InspectionNotes* <br /> 1.Work performed by General Contractor 10.site meeting participants and discussion <br /> .Work performed by subcontractors 11.Variations from plans and sped.,instigator, action <br /> .Work items or extra started taken,contrs.seeking compen., item,labor and <br /> 4.Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remarks <br /> .serious accidents 13. Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.fork not meeting specifications <br /> . Equipment on site 15. Items in 14 not corrected. <br /> Copies to: Staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.