My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
>
10/16/1996 TOWN HALL BUILDING COMMITTEE Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 5:09:16 PM
Creation date
4/24/2019 1:33:33 PM
Metadata
Fields
Template:
Mashpee_Meeting Documents
Board
TOWN HALL BUILDING COMMITTEE
Meeting Document Type
Minutes
Meeting Date
10/16/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Representative's entative's Dail Report Page 7 of <br /> Deport No. 50 <br /> Date: g 1 <br /> Architect: Strekalovsky&Holt., Inc. Day: W <br /> Project: Mashpee Town ball Contractor D'Agosttno Associates <br /> Superintendent: Len Paoletta <br /> Weather: 8:00 AM Partly cloudy Noon: Cloudy PM: Cloudy <br /> Ternperature: 8:00 AM 66 Noon: 74 4PM: 72 <br /> PERSONNEL COUNT Spec. Contractor TraEde Workforce <br /> rkforee <br /> Sect. Foreman Journeymen Helpers Total <br /> General <br /> Contractor: <br /> D"Agostino 1 Job Supt. I <br /> Masonry 2 <br /> Sub ontrar for - <br /> Rons Excavating 2 2 <br /> JJ Enterprises 2 <br /> Reardon Elec 1 <br /> TOTAL g <br /> Notes: Excavator removing frost walled areaway at new bldg, entrance. Trenching and areaway <br /> this location is being backfilled In compacted "lifts. The roughed-in chase at <br /> rest rooms, north wing has been backfilled. Excavator continued to remove <br /> construction debris from site. <br /> The masons are working on north wall of south wing and resumed prep work on <br /> masonry openings in the north wing. <br /> Demolition contractor continued site and bldg. clean-up. <br /> Electrical sub-contractor continued working on underground power. Reardon started <br /> conduit risers up utility pole along Great Neck Road. There is no bltuma tic coating <br /> n roof of temporary weatherproof enclosure at elect porn panels. <br /> Number Key to InspectionNotes: <br /> 1.Work performed by General Contractor 10.Site meeting participants and discussion <br /> .Work performed by Subcontractors 11.Variations from plans and specs.,instigator,action <br /> .Work items or extra started taken,contrs.seeking compen.,item,labor and <br /> .Work items or extra completed materials <br /> . Potential or encountered delays 12. Description of job incidents and remarks <br /> .Serious accidents 13.Material and equipment for installation received, <br /> 7.Visitors and reasons compliance to specs. <br /> .Testing or inspection 14.Work not meeting specifications <br /> g. Equipment on site 1 . Items in 14 not corrected. <br /> Copies to: staff Signed: <br />
The URL can be used to link to this page
Your browser does not support the video tag.